| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.8 LAccepted-AOC | ₹17.8 L Quoted ₹15.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹18.6 LRejected-Finance | ₹18.6 L | 2 | Rejected-Finance Being Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical All Required Document are Not Complete |
Tender Value
₹18.6 L
EMD Value
₹38,000
Closing Date
16 Mar 2026, 2:00 pmClosed
Project Manager,(Unit-32) Aligarh
Ho. No- M.I.G-88, P,A.D.A Colony (Avantika), Ramghat Road Aligarh
CONSTRUCTION OF BOUNDARY WALL FOR GIRLS HOSTEL SIKANDRARAO IN DISTRICT HATHRAS (U.P.)
2026_UPPRC_1123113_4
05/PM-32/UPPCL/2025-26 Dated 06-03-2026
Open Tender
Civil Works - Buildings
Percentage
90 days
SIKANDRARAO IN DISTRICT HATHRAS (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹38,000
Office of Project Manager,(Unit-32) Aligarh
17 Jul 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m.(5 fts.) and lead upto 30m.(100 fts.) & including filling. watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30 m.(100 fts.) from the foundation trenches. UPTO 1500 MM | - | CUM | - | - |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation | - | CUM | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). Up to plinth level | - | CUM | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). Up to plinth level | - | CUM | - | - |
| 5 | Above plinth level | - | CUM | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | CUM | - | - |
| 7 | T.M.T.-FE-500 steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks. | - | QTL | - | - |
| 8 | M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | - | CUM | - | - |
| 9 | Half brick masonry with (Class M-150 First Class Brick) in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 0.2 | SQM | - | - |
| 10 | 12 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 fine sand. | - | SQM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Bid_Sikandrarao.pdf
Tender Documents • 5.27 MB
BOQ_2092000.xls
BOQ • 0.28 MB
corrigendum.pdf
PDF • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].