Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC | L1 | Accepted-AOC Lowest value |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
14 Feb 2024, 2:30 pmClosed
SE SEDC Salem
SE SEDC Salem
Works Contract in respect of East Attur SubDivision Rural Attur Kattukottai and Manjini Sections
2024_EB_418187_1
SE/SEDC/WC.NO.048/2023-24, Dt.30.01.2024
Open Tender
Electrical and Maintenance Works
Works
365 days
Attur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
19 Jun 2024
3 Feb 2024
15 Feb 2024
3 Feb 2024
14 Feb 2024
4 Feb 2024
Amount
Excavation of pole pit up to 27”(8.0m) pole
Excavation of pole pit 9.0 Mtr and above RSJ pole
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC poles/Metal pole up to 8.00m (27’)
Erection of PSC/RCC poles/Metal pole up to 9.14.m(30’)
Erection of RSJ Metals Poles above 9.0 m (40')
Erection of stay set complete
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT /LT TI Fitting
Fixing of HT Pin Insulators (11/22KV)
Fixing of HT 11KV stain disc
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
ACSR 7/4.09 mm Raccoon conductor
7/3.35mm ACSR 7/3.15mmAAAC(per Km)
7/2.59mm ACSR & 7/2.50mm AAAC(per Km)
Earthing of Poles
Tree cutting (Clearing of Branches)
Drilling of Holes
Cutting of channel
Loading of Transformer upto 100kVA for each
Unloading of Transformer upto 100kVA for each
Loading of Transformer upto 200kVA for each
Unloading of Transformer upto 100kVA for each
Erection of New Transformer all capacities (with jumpering)
Loading or Unloading of Transformer upto 100kVA for each
Loading or Unloading of Transformer upto 200kVA for each
Dismantling of New Transformer all capacities (with jumpering)
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Each.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel, belting angle including concreting ( Except erection of transformer) - Double pole structure
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Each. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Dismantling of Transformer structure completed - Double pole structure
Transport of poles/Materials/ conductors and other materials Below 8 Kms
Transport of poles/Materials/ conductors and other materials Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
Loading of poles upto 27"
Loading of poles upto 30"
Un Loading of poles upto 27"
Un Loading of poles upto 30"
Loading of metal poles all size
UnLoading of metal poles all size
Loading of line Materials
Unloading of line Materials
Releasing of Single Phase service wire and refixing
Releasing of Three Phase service wire and refixing
Alteration of back clamps to suits for the works
Alteration of stay clamps to suits for the works
Dismandling of pole & pole pit and loading unloading of grills (7.5mtr & 8mtr)
Dismandling of pole & pole pit and loading unloading of grills 9 mtr
Dismantling of HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
Dismantling of HT /LT TI Fitting
Dismandling of HT Pin Insulators (11/22KV)
Dismandling of HT 11KV stain disc
Dismandling of 22 KV disc
Dismandling of 3 PH X arm
Dismandling of Alu Knob
Dismandling of LT pin Insulator
Dismandling of LT Shackle Insulator
Dismantling of Stay Set Complete
Dismandling of 7/3.35 mm ACSR conductor (Km)
Dismandling of 7/2.59 & 7/2.11 mmACSR conductor (Km)
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .