| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.8 L+₹79,552.20 (7.95%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SUGANYA ENTERPRISES | S.KUNJAN |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 5.15 | M3 | 27,295 ₹32,208.1 Lowest | 28,325 ₹33,423.5 |
| 2.00 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete. | 0.2 | M3 | 80 ₹94.4 Lowest | 100 ₹118 |
| 3.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 220.4 | M2 | 11,020 ₹13,003.6 Lowest | 13,224 ₹15,604.32 |
| 4.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 41.4 | M2 | 496.8 ₹586.22 Lowest | 828 ₹977.04 |
| 5.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete. | 63.6 | M2 | 38,160 ₹45,028.8 Lowest | 44,520 ₹52,533.6 |
| 6.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 5.15 | M3 | 56,650 ₹66,847 | 6,180 ₹7,292.4 Lowest |
| 7.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 257.5 | Kg | 30,900 ₹36,462 Lowest | 38,625 ₹45,577.5 |
| 8.00 | Providing PCC 1:4:8 using OP/PP cement with 20 to 12 mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 16.1 | M3 | 1,12,700 ₹1,32,986 Lowest | 1,20,750 ₹1,42,485 |
| 9.00 | Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, Labours, lead, curing, etc. complete. | 0.2 | M3 | 1,400 ₹1,652 Lowest | 1,460 ₹1,722.8 |
| 10.00 | Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete. | 5.4 | M2 | 7,020 ₹8,283.6 Lowest | 7,560 ₹8,920.8 |
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
12 May 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair and Maintenance works to the Inner Rooms in Type 2 Quarters Block No. 29, 30, 45 and 46 at analmin Nagar
2025_EB_550152_1
CE SE C TTPS Spec. No 78 25 26
Open Tender
Civil Works - Others
Item Rate
180 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,400
Yes
20 Sept 2025
23 Apr 2025
13 May 2025
23 Apr 2025
12 May 2025
23 Apr 2025
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete.
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete.
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
Providing PCC 1:4:8 using OP/PP cement with 20 to 12 mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, Labours, lead, curing, etc. complete.
Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete.
Supplying and fixing of wooden Windows shutters with country wood outer frame of size 100x75mm and the shutter frame 75x50mm with plywood shutters 12mm thick and 5mm thick glass including cost of all materials, labour lead, lift, etc., complete.
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:5, 12mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete.
White washing two coats with shell lime including cost of all materials, labours, lead, lift, scaffolding, curing, etc. complete.
Colour washing Two coats without primer including cost of all materials, colour pigments,Fevicol, Labour, lead, scaffolding, curing, lift, etc., complete.
Painting two coats with ready mixed enamel paint for the old wooden doors,windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Supplying and fixing in position of PVC door of approved quality and colour with 25mm thick PVC shutter including cost of all specials, materials, labour, lead, lift etc., complete.
Replacing the damaged Indian water closet of size 450mm white glazed earthware with 'P' trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing of PVC pipe of 110mm dia 4kg/cm2 with necessary specials for Rainwater down fall pipe lines and finishing grooves surface plastering in CM 1:2 mix including cost of all materials, labour, lead, lift etc., complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. a) PVC pipe 110mm dia
b) PVC pipe 75mm dia
Supplying laying and jointing in position of 15mm & 20mm dia GI pipes ('B' Class) as instructed by the site Engineer rate, including cost of all materials, labour, lead, lift, with necessary scaffolding etc., complete. a) 15mm dia GI Pipe
20mm dia GI Pipe
25mm dia GI Pipe
32mm dia GI Pipe
Supplying and fixing GM Wheel valve of approved quality including cost of all materials, labour, lead, lift etc., complete a) 32mm Wheel valve
b) 25mm Wheel valve
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .