Executive Engineer Construction Division Leh
Executive Engineer Construction Division Leh
Construction of link Road from Dakgyap to Dortundup Matho km Rd 780 900 by way of construction of R/W and filling
2021_PWD_4018_3
135 of CDL Leh of/2021-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
LEH
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Executive Engineer Construction Division Leh
₹16,800
25 Dec 2021
25 Aug 2021
13 Sept 2021
25 Aug 2021
10 Sept 2021
25 Aug 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Ordinary Rock
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Nallah
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone.
Dumping stone excluding cost of stones. In horizontal on level
Providing & laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone agg 20 mm nominal size) and curing complete
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks,marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Centering and shuttering including strutting, propping etc. and removal of form work for: a) Foundations, footings, bases for columns
Carriage of material by MT from source to site of work including loading unloading complete job. A)Cement avg lead upto 25 kms
B)Sand an avg lead 10 km
C) Stone Aggregate below 40mm an avg lead 08 km
D)Stone an avg lead 15 km
E) Earthe an avg lead 03 km
M/S ABDUL HAKIM
M/S NEMA LOTUS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .