Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.5 LAccepted-AOC | ₹17.5 L | 1 | Accepted-AOC Lowest Value quoted |
| 2 | 2₹17.8 LRejected-Finance | ₹17.8 L | 2 | Rejected-Finance Tender Amount Above |
| Sl No | Description | Qty | Unit | ABDULWAHID L1 | MR.E.MARIAPPAN, CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of 2x4.00m Span Minor Bridge Across the Channel infront of TIME School in Munneerpallam Village Panchayat of Palayamkottai Panchayat Union. | |||||
| 2.00 | Earth work Excavation in all classes of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., Complete | 139.12 | cum | 263 ₹36,588.56 | 300 ₹41,736 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including conveyance of all materials and all labour charges etc., complete | 43.78 | cum | 5,394 ₹2.4 L | 5,400 ₹2.4 L |
| 4.00 | Centering charges for all concrete works including all cost and conveynace of all materials and all labour chages etc., complete
For shuttering - below sill level | 89.28 | sqm | 547 ₹48,836.16 | 600 ₹53,568 |
| 5.00 | For Shuttering - Above Sill Level | 203.8 | cum | 547 ₹1.1 L | 600 ₹1.2 L |
| 6.00 | for Deck slab centering | 67.25 | sqm | 1,095 ₹73,638.75 | 1,120 ₹75,320 |
| 7.00 | cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 121.78 | cum | 5,697 ₹6.9 L | 5,720 ₹7.0 L |
| 8.00 | Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 29.9 | cum | 9,167 ₹2.7 L | 9,200 ₹2.8 L |
| 9.00 | Supplying, Fabricating and Placing in position of MS Steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification | 2.54 | MT | 91,858 ₹2.3 L | 91,900 ₹2.3 L |
| 10.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 5.38 | cum | 6,783 ₹36,492.54 | 6,800 ₹36,584 |
Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
20 Aug 2025, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Construction of 2x4.00m span Minor Bridge across the Channel infront of TIME School in Munneerpallam Village Pt of Palayamkottai Panchayat Union NNT 2025-26
2025_RDTN_593198_1
A3/3474/2025
Open Tender
Construction Works
80 days
Commissioner, Panchayat Union, Palayamkottai.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,000
5 Jan 2026
14 Aug 2025
20 Aug 2025
14 Aug 2025
20 Aug 2025
14 Aug 2025
Amount
Construction of 2x4.00m Span Minor Bridge Across the Channel infront of TIME School in Munneerpallam Village Panchayat of Palayamkottai Panchayat Union.
Earth work Excavation in all classes of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., Complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including conveyance of all materials and all labour charges etc., complete
Centering charges for all concrete works including all cost and conveynace of all materials and all labour chages etc., complete For shuttering - below sill level
For Shuttering - Above Sill Level
for Deck slab centering
cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Supplying, Fabricating and Placing in position of MS Steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete
Supply and Fixing of Bitumen Pad
MR.E.MARIAPPAN, CONTRACTOR (BID ID -1432681)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid