| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹14.9 L+₹43,050 (2.98%)Accepted-Finance | L2 | Accepted-Finance Qualified |
Tender Value
₹14.8 L
EMD Value
₹15,000
Closing Date
21 Jun 2024, 2:00 pmClosed
SE EDC BIJNOR
AVAS VIKAS COLONY, BIJNOR
The work of replacement of Jarjar Wire, GI Wire, Damage Pole, Guarding and Earthing of Distribution Transformers etc under EDD-Ist, Bijnor in BP 2024-25
2024_PVVNL_922407_3
75/2023-24/EDC BIJNOR
Open Tender
Electrical Works
Item Rate
90 days
SE EDC BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC BIJNOR
₹15,000
Yes
26 Jun 2024
20 May 2024
21 Jun 2024
20 May 2024
21 Jun 2024
20 May 2024
Amount
Safe carriage of the following material from Store Centre, Bijnor to work site including loading & unloading.
Cartage of STP/PCC Pole 11 mtr. Long form ESC Bijnor to above site including loading and unloading at both ends.
Cartage of line material from ESC bijnor to above site including loading and unloand at both ends.
Cartage of ACSR Weasel Conductor from ESC bijnor to above site including loading and unloand at both ends.
Installation of following material, making proper connections complete work as per RESPO manual and as per direction of Supervising Engineer (complete in all respect). Work includes the cost of labour,T&P by providing nut, bolt and all other acessaries/material for proper completion of work.
Grouting of PCC/ST pole as per norms
Erection of Pin insulator with fitting as per respo norms
Erection of earthing rod grouting as per respo norms
Erection of 33 KV V type as per respo norms
Laying lifting ACSR Weasel Conductor sagging & binding properly of line
Erection of Single pole section 11 mtr long with all accessories as per Resspo norms
Erection of 11 KV V type as per respo norms
Erection of Double Pole with as per respo norms
PROVIDING, FIXING & WELDING MS GALVANISED PIPE DIA 2 INCH UP TO WATER LAVEL AS PER SITE REQUIRMENT & GI STRIP SIZE 50*5 MM AS PER SITE REQUIRMENT (78 NOS MEDIUM POWER DISTRIBUTION T/F NEUTRAL & BODY ERTHING WORK COMPLETE AT BUKHARA SUB STATION BIJNOR ) AS PER RESPO NORMS
Providing & fixing of Holding clamp,
Providing & fixing of MS Bolt & Nuts Etc
Providing & fixing of F Clamp
Uninstallation of following material from double pole and safe carriage from site to store center Bijnor with loading and unloading at both ends.
DISMENTLING OF ACSR SCRAP AND SEND TO ESC BIJNOR FROM SITE
M/S MUDASSIR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .