Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.1 L+₹6,003.54 (1.00%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
11 Aug 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Execuitve Engineer
Execuitve Engineer Hyd Div Tangdar
Construction / Repairment of ibkote Bhaderkote Khul.
2026_PHE_319496_3
NIT NO 01 of 2026-27
Open Tender
Civil Works
Percentage
Bhaderkote KHul
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Xen Div Tangdar
₹12,000
6 Nov 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | 28.2 | Cum | 479.3 | ₹13,516.26 |
| 2 | Providing and laying Dry Stone Soling hand packing tightly | 5.43 | cum | 800 | ₹4,344 |
| 3 | Providing and laying in position Cement Concrete 1:4:8 mix with 40mm aggregate excluding cost of centring and Shuttering. All work upto plinth level. | 5.43 | cum | 5,202.9 | ₹28,251.75 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 8.37 | cum | 7,104.35 | ₹59,463.41 |
| 5 | Reinforcement for RCC Work including straightening, cutting, bending, binding all complete. | 627.75 | kg | 123.2 | ₹77,338.8 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 38.47 | Cum | 5,733.6 | ₹2,20,571.59 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 28.86 | Sqm | 628.95 | ₹18,151.5 |
| 8 | 4.6.1 Foundations, footings, bases for columns | 63 | Sqm | 286.35 | ₹18,040.05 |
| 9 | Providing and fixing MS pipe flange 20mm thick including Nuts & Bolts all fittings complete | 18 | Mtr | 6,000 | ₹1,08,000 |
| 10 | Providing and fixing pvc pipie 6" dia rigs type all fittings | 28 | Rm | 500 | ₹14,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1058575.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .