Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC GSTIN: 19AAAAA2503J1ZR, 19AAAAN2503J1ZR, 19AACCH9135N1Z1, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEXPC3746A1ZGBANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹6.4 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹6.4 LRejected-Finance GSTIN: 19AAKFM3644C1ZB, 19AAKFM3644C1ZH, 19AAKFU0544C1ZB, 19AEEPD6034P1Z8GROUND FLOOR GANGA APARTMENT KOTHABARI NEW BANSHBARI MALDA | 73 | ₹6.4 L | L2 | Rejected-Finance Higher than L1. |
| 3 | L3₹6.4 LRejected-Finance GSTIN: 19AACCH9135N1Z1, 19AACFD3344C1ZV, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEEPD6034P1Z8, 19AEXPC3746A1ZG, 19AGVPD9724H1ZT, 19AMFPD7752B1Z8, 19ANXPD9601L1ZB, 19AOXPD9320B1ZU, 19CAFPD9818Q1ZX, 19CEVPD1860E1ZC, 19CMLPD0247B1ZG00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹6.4 L | L3 | Rejected-Finance Higher than L1. |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L3 | MERCURY ENGINEERINGCOMPANY L2 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00Labour charges for 1 (One) no. operating personnel for operation and guarding of pump / valve / disinfection arrangement with all accessories. | ||||||
| 1.01 | For P/H No. I | 366 | Days | 519 ₹1.9 L | 518.4 ₹1.9 L | 517 ₹1.9 L |
| 1.02 | ESIC Contribution of Empleyers for SL NO 1.01 (@3.25%) | 366 | Days | 13.13 ₹4,805.58 | 13.13 ₹4,805.58 | 13.13 ₹4,805.58 |
| 1.03 | EPF Contribution of Empleyers for SL NO 1.01 (@13%) | 366 | Days | 52.52 ₹19,222.32 | 52.52 ₹19,222.32 | 52.52 ₹19,222.32 |
| 1.04 | For P/H No. II | 366 | Days | 519 ₹1.9 L | 518.4 ₹1.9 L | 517 ₹1.9 L |
| 1.05 | ESIC Contribution of Empleyers for SL NO 1.04 (@3.25%) | 366 | Days | 13.13 ₹4,805.58 | 13.13 ₹4,805.58 | 13.13 ₹4,805.58 |
| 1.06 | EPF Contribution of Empleyers for SL NO 1.04 (@13%) | 366 | Days | 52.52 ₹19,222.32 | 52.52 ₹19,222.32 | 52.52 ₹19,222.32 |
| 2.00Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period. | ||||||
| 2.10 | For P/H No. I | 12 | month | 8,690 ₹1.0 L | 8,691 ₹1.0 L | 8,681 ₹1.0 L |
| 2.20 | For P/H No. II | 12 | month | 8,690 ₹1.0 L | 8,691 ₹1.0 L | 8,681 ₹1.0 L |
Tender Value
Refer Docs
EMD Value
₹12,900
Closing Date
28 Dec 2023, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and Guarding of pumping machinery (Automatic Operation) including all allied electro-mechanical components installed at DALLA W/S Scheme in the district of Malda under MLMD, PHE Dte.
2023_PHED_611736_103
WBPHED/EE/MLMD/NIeT_26 of 2023-24
Open Tender
Electrical Work/ Equipment
366 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,900
Yes
26 May 2026
7 Dec 2023
2 Jan 2024
7 Dec 2023
28 Dec 2023
7 Dec 2023
Amount
Labour charges for 1 (One) no. operating personnel for operation and guarding of pump / valve / disinfection arrangement with all accessories.
For P/H No. I
ESIC Contribution of Empleyers for SL NO 1.01 (@3.25%)
EPF Contribution of Empleyers for SL NO 1.01 (@13%)
For P/H No. II
ESIC Contribution of Empleyers for SL NO 1.04 (@3.25%)
EPF Contribution of Empleyers for SL NO 1.04 (@13%)
Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period.
For P/H No. I
For P/H No. II
ADD Cess @ 1%
MERCURY ENGINEERINGCOMPANY
DEY ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid