Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹10.4 L+₹1.0 L (11.0%)Rejected-Finance GF AKRITI TOWER 19 B VIDHAN SABHA MARG LUCKNOW PIN 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | L2 | Rejected-Finance Other than L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
24 Feb 2022, 6:00 pmClosed
GE (AF) E/M CHAKERI KANPUR
GE (AF) E/M CHAKERI KANPUR-08
WORK SERVICES FOR OPERATION OF FIRE PUMP HOUSE, MAINT OF FIRE HYDRANT SYSTEM OF 110 BLOCK AND COMPREHENSIVE MAINT OF CO2 FLOODING AND FIRE ALARM SYSTEM FOR 110 BLOCK AND ROH IN TECH AREA AT AF STN CHAKERI KANPUR
2022_MES_504084_1
8556/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (AF) E/M CHAKERI KANPUR
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) E/M CHAKERI
₹40,000
Yes
22 Mar 2022
27 Jan 2022
26 Feb 2022
27 Jan 2022
24 Feb 2022
11 Feb 2022
Amount
Supply only optical type smoke detector supply voltage 9 to 33 V DC, UL/FM/LPC approved with junction box and base to be fixed inside test rig with suitable fixing arrangement complete all as specified and directed. Make- Apollo/System Sensor/Siemens
Supply only fixed cum ROR type heat detector class AIR supply voltage 9 to 33 V DC, UL/FM/LPC approved with base complete all as specified and directed. Make- Apollo/System Sensor/Siemens
Supply only optical type Multisensor smoke with heat detector supply voltage 9 to 33 V DC, UL/FM/LPC approved with junction box and base to be fixed with suitable fixing arrangement complete all as specified and directed. Make- Apollo/System Sensor/Siemens
S&F in replacement of gun metal landing valve single headed 80 mm dia, flanged inlet 63 mm dia instant type female outlet with gun metal cap complete all as specified and directed. Make- G Tech/GEM/New Age/Flamex/ Omex
S&F in replacement of 63 mm dia RRL hose pipe 30 m long with instantaneous type gun metal 63 mm dia ISI marked male & female couplings bend riveted to hose pipe complete all as specified and directed. Make- New Age/Atasi/Omex
S&F in replacement of pneumatic actuator made of brass on CO2 cylinder ISI marked IS 3224, complete all as specified and directed. Make- KEW /Rotex
S&F in replacement of electric solenoid operated actuator code 20126-1.2-2G-S8 DC 24 Volt 11 Watt type 6 Size II all as per IS 8935 for operating the value of nitrogen cylinder complete all as specified and directed. Make- Rotex/KEW
S&F in replacement of wire braded high pressure discharge hose 3/8" WP 3024 PSI /210 BAR on CO2 cylinder complete all as specified and directed.
Supply and filling CO2 gas in fire extinguisher of different capacity including transportation for refilling from site to workshop on to & fro basis including testing of cylinder before filling the gas complete all as specified and directed.
Supply and filling N2 gas in fire extinguisher of different capacity including transportation for refilling from site to workshop on to & fro basis including testing of cylinder before filling the gas complete all as directed.
S&F in replacement of CO2 release unit for manually operated with push button fired bride MS box duly painted sealed with glass ccomplete all as specified and directed. Make Agani/NSD/Agani Alarm
S&F in replacement of manual call point with push button fired bride MS box duly painted sealed with glass including necessary electrical connection complete all as specified and directed. Make Agani/NSD/Agani Alarm
S&F in replacement of low intensity hooter for warning of fire connected with central contol panel installed in each zone inside the rooms complete all as specified and directed. Make Agani/NSD/Agani Alarm
Repair/Maintenance of Fire Zone panels /fire alarm panel in the 110 Block /ROH Flight by means of their cleaning, checking of circuits including recalibration to make the system serviceable complete all as specified and as directed. Note :- Spare parts measured and paid seperately under respective item of "BOQ".
S&F in replacement of single stage N2 gas regulator system for digital panel complete all as specified and directed.
S&F in replacement of display card microprocessor based detecting system of CO2 flooding system for digital panel complete all as specified and directed.
S&F in replacement of zone card for digital panel complete all as specified and directed.
S&F in replacement of gas flooding control card of CO2 flooding system for digital panel complete all as specified and directed.
S&F in replacement of SMPS power supply including transformer of CO2 flooding system for digital panel complete all as specified and directed.
S&F in replacement of adaptor for N2 gas cylinder making all arrangement to arrest leakage of gas for digital panel complete all as specified and directed.
S&F in replacement of lead acid battery of 12 Volt, 7 AH complete all as specified and directed. Make- EXIDE /OKAYA/AMRON
S&F in replacement of lead acid battery of 12 Volt, 32 AH complete all as specified and directed. Make- EXIDE /OKAYA/AMRON
S&F in replacement of lead acid battery of 12 Volt, 150 AH complete all as specified and directed. Make- EXIDE /OKAYA/AMRON
Repair, comprehensive and preventive Maintenance of FIREALARM AND CO2 FLOODING SYSTEM 110 Block (22 Nos rig, each rig seprate zone panel, 83 Nos CO2 Cylinder and 22 Nos N2 Cylinder and 12 Zone Fire Alarm system conventional type) as per manufacturers reccomendation which include the following:- (i) Checking and cleaning of smoke/heat detectors, nozzles/CO2 pipe line etc. complete all as specified and directed. (ii) Checking of main control panel and control wiring complete all as specified and directed. (iii) Weighing of CO2/N2 cylinders complete all as specified and directed. Note: (a) If any defect notice/found, the same should be rectify immediatly and report to Engr-in-charge. (b) Spares shall be measured and paid separately under relavent item of schedule. (c) If defect not rectified by contractor with in stipulated period as directed by Engr-in-charge then penality @ 500/per day will be recover from RAR/ Final BILL.
Repair, comprehensive and preventive maintenance of CO2 flooding system in ROH flight (one nos two zone panel, 8 Nos CO2 Cylinder and 01 Nos N2 Cylinder) as per manufacturers reccomendation which include the following:- (i) Checking and cleaning of smoke/heat detectors, nozzles/CO2 pipe line etc. complete all as specified & directed. (ii) Checking of main control panel and control wiring complete all as specified and directed. (iii) Weighing of CO2/N2 cylinders complete all as specified and directed. Note: (a) If any defect notice/found, the same should be rectify immediatly and report to Engr-in-charge. (b) Spares shall be measured and paid separately under relavent item of schedule. (c) If defect not rectified by contractor with in stipulated period as directed by Engr-in-charge then penality @ 500/per day will be recover from RAR/ Final bill.
Testing of CO2 flooding system in automatic and manual mode in rigs of 110 Blocks/ROH flight by flooding of CO2 gas in rig and re-installing filled CO2 gas cylinder, cleaning of smoke/heat detector and making system functional complete all as specified and directed.
S&F in replacement of Fire extinguisher CO2 type 4.5 kg capacity Cylinder ISI marked IS : 15683 class 13 B type of fire fitted with PVC bend horn complete all as directed. Make: Cease fire/Omex/Minimax
S&F in replacement ABC type fire extinguisher 9 kg capacity ISI marked confirming to IS 15683 with & discharge pipe etc. as required complete all as specified and directed. Make-Cease fire/Omex/Minimax
Repair and maintenance of automatic system of Fire pump house including replacement of control wiring, relay, contactor etc. including replacement of minor parts to make functional and interlocking of jockey pump, main fire pump and fire engine pump set including testing complete all as specified and directed.
S&F in replacement of pressure switch universal type as per existing type complete all as specified and directed. Make- Indfos or make as approved by GE.
Supply and laying in replacement XLPE insulated PVC sheathed armoured copper conductor 1.5 Sqmm 2 core on surface with fitting complete all as specified and directed. Make- Fionlex /Plaza/Havells.
Supply and laying in replacement FR PVC insulated copper conductor 1.5 Sqmm 2 core multistrand flexible cable drawing in existing steel conduit complete all as specified and directed. Make- Fionlex /Plaza/Havells.
Operation of all equipement inastalled in Fire Fighting Pump House installed at 110 Block in tech area in 02 Shifts (one skilled operator to be deployed for each shift except sunday & holiday or as decided by Air Force Authority) including routine cleaning of pump house and operation of fire hydrant system complete all as specified and directed. Tentative shift timing shall be as under, however it can be changed as per site requirement:- (i) 0600 hrs to 1400 hrs (ii) 1400 hrs to 2200 hrs
Notes for item No 33.00:- (i) No payment will be made if the trademen found absent and recovery @ Rs 1550/- shall be made for per shift per operator. (ii) Proper attendance register duly signed by JE & Engineer-in-charge and contractor shall be maintained. (iii) Daily log sheet on prescribed format as decided by the Engineer-in-charge shall be arranged by the contractor without any extra cost and shall be submitted to the Engineer-in-charge duly signed by the trademen. The rate quoted under these item is inclusive for the same. (iv) Proper uniform of trademan indicating the name of operator and firm shall be arranged by the contractor without any extra cost. Dress colour shall be approved by GE. The rate quoted under these item is inclusive for the same. (v) The Contractor shall provide normal mobile phones (without camera) with incoming & outgoing facility to contact in emergency during any breakdowns to essential utility services like pump fault, burst water mains etc. Smart phone will not be permitted. (vi) The trademan employed should have ITI in respective trade with two years experience in respective fields. (vii) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines. (viii) No operator shall work more than eight Hours. (ix) All T&P required for routine cleaning shall be arranged by the contractor without any extra cost to Govt.
S&F in replacement sluice valves 150 mm dia class PN-1.0 , IS-14846 with flanged ends, stainless steel spindle and iron wheel including nut bolts and rubber packing complete all as specified and directed. Make- Kirloskar /Upadhaya /GDPA/Kartar
All as per item No 34.00 above but 100 mm bore.
Cleaning of semi under ground water sump of capacity 20000 Gallons approx inside by Mechanised de-watering by using industrial submersible pump, Scrapping sludge and removal by using industrial sludge pumping, Cleaning of all dust particle, Sterilization of sump by using chlorination chemical on internal surfaces of wall including preperation of surfaces, writing date of cleaning of sump with white paint on black base complete all as specified and directed.
Repair and preventive maintenance of 55 KW centrifugal pump which include replacement of bearing, gland etc. and tightening of nuts bolts, washers greasing etc for proper running of pump and checking of all electrical connections from engine to panel and make it functional in manual/auto mode complete all as specified and directed. Note : Spare parts shall be measured and paid separately.
Repair and preventive maintenance of Centrifugal fire pump 15 KW, which include replacement of bearing, gland etc. and tightening of nuts bolts, washers greasing etc for proper running of pump and checking of all electrical connections from engine to panel and make it functional in manual/auto mode all as directed. Note : Spare Parts shall be measured and paid separately.
Supply only Bearing of centrifugal pump 55 KW exsisting size complete all as specified and directed. Make- SKF/Tata/NBC
Supply only Bearing of Centrifugal fire pump 15 KW exsisting size complete all as specified and directed. Make- SKF/Tata/NBC
Supply only rubber bush for coupling complete all as specified and directed..
Supply only Gland bush set complete all as specified and directed..
Supply only Gland packing including nut & bolts suitable for 15/55 KW fire pump and engine set complete all as specified and directed.
Repair and preventive maintenance of Fire diesel engine pump set 93BHP capacities which include tightening of battery terminals, checking of oil level, greasing, filling of distilled water in battery etc and any minor repair to make engine set functional complete all as specified and directed.
S&F in replacement rubber hose pipe of engine set 93 BHP complete all as specified and directed.
S&F in replacement oil pressure pipe of Engine set 93 BHP complete all as specified and directed.
Supply and filling coolant for radiator of any type of DG set complete all as specified and directed. Make: Castrol/Servo/HP
Supply only Lub Oil filter of engine set 93 BHP complete all as specified and directed. Make- Mico /Kirloskar/Fleet guard
Supply only Diesel filter of engine set 93 BHP complete all as specified and directed. Make- Mico /Kirloskar/Fleet guard
Repair and overhauling and servicing of self starter 12 V by replacement of clutch, carbon bush etc complete all as specified and directed.
Supply and filling of Engine oil 20W-40 complete all as specified and directed. Make- Castrol/Servo/HP
S&F in replacement of battery 12 volts 180AH including battery terminals complete all as specified and directed. Make- Exide/Amron/SF
S&F in replacement of MS ERW pipe 200 mm bore class C heavy duty including cutting and welding , fittings for fire pipe line in pump house complete all as specified and directed. Make- Jindal/Tata / Prakash Surya
All as per item No 53.00 above but pipe size 100 mm
All as per item No 53.00 above but pipe size 80 mm
M&L for two coats painting of plant MS platform angle/pipe/channel support MS tank from out side cable tray and other related surface using Synthetic enamel paint of existing colour including removing rust/dust and oil from surface and writing letters etc complete all as specified and directed.
Prime Technology
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .