| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.6 LAccepted-AOC | ₹79.6 L Quoted ₹81.1 L | L1 | Accepted-AOC Reasonable rate |
| 2 | L2₹83.6 L+₹2.5 L (3.11%)Rejected-Finance | ₹83.6 L+₹2.5 L (3.11%) | L2 | Rejected-Finance Quoted amount higher than L1 |
| 3 | L3₹83.6 L+₹2.5 L (3.13%)Rejected-Finance | ₹83.6 L+₹2.5 L (3.13%) | L3 | Rejected-Finance Quoted amount higher than L1 |
| 4 | L4₹83.7 L+₹2.6 L (3.16%)Rejected-Finance | ₹83.7 L+₹2.6 L (3.16%) | L4 | Rejected-Finance Quoted amount higher than L1 |
| 5 | L5₹84.0 L+₹2.9 L (3.56%)Rejected-Finance | ₹84.0 L+₹2.9 L (3.56%) | L5 | Rejected-Finance Quoted amount higher than L1 |
| Sl No | Description | Qty | Unit | M/S PAUL ENTERPRISE L4 | SHRI CHANDAN CHANDA L9 | SHRI RAJESH DEY L5 | M/S SWAPAN DEBNATH L8 | M/s Amrit Gope L1 | M/S PRITAM ENTERPRISES L7 | M/S New Saha Enterprise L2 | Pranjit kar L6 | RANA DATTA L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking out complete existing roof treatment from roof surfaces and roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust and removing rubbish at distance not exceeding 50m as per direction of Engineer-in-Charge complete all as specified and as directed. | 210 | Sqm | 100 ₹21,000 | 140 ₹29,400 | 110 ₹23,100 | 140 ₹29,400 | 85 ₹17,850 Lowest | 120 ₹25,200 | 95 ₹19,950 | 120 ₹25,200 | 120 ₹25,200 |
| 2.00 | Material and labour for Cutting out cracks to V-section in existing RCC roofs or terrace, cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) complete all as specified and directed.
Note: Cutting of grooves will be carried out by using mechanical means like Groove cutter/ wall chaser. | 65 | RM | 160 ₹10,400 | 175 ₹11,375 | 180 ₹11,700 | 175 ₹11,375 | 156 ₹10,140 Lowest | 180 ₹11,700 | 160 ₹10,400 | 168 ₹10,920 | 165 ₹10,725 |
| 3.00 | Material and labour for 15 mm thick screed bed or bedding layer in CM 1:4 mixed with water liquid proofing compound @ 200 ml per bag of cement on concrete roof surface, finished the surface fair and even to maintain the proper slope of roof surface complete all as specified and as directed.
(Note: Liquid WPC shall be measured and paid separately) | 210 | Sqm | 345 ₹72,450 | 360 ₹75,600 | 360 ₹75,600 | 360 ₹75,600 | 339 ₹71,190 Lowest | 360 ₹75,600 | 345 ₹72,450 | 350 ₹73,500 | 345 ₹72,450 |
| 4.00 | Material and labour for PCC (1:2:4) type B0 (using 12.50mm graded stone aggregate) mixed with water liquid proofing compound @ 200 ml per bag of cement as in chajjas, rounded or chamfered on edges complete all as specified and as directed.
(Note: Liquid WPC shall be measured and paid separately) | 1.5 | Cum | 11,725 ₹17,587.5 | 13,000 ₹19,500 | 11,800 ₹17,700 | 13,000 ₹19,500 | 11,700 ₹17,550 | 12,000 ₹18,000 | 11,750 ₹17,625 | 11,500 ₹17,250 Lowest | 11,800 ₹17,700 |
| 5.00 | M & L for cleaning plastered surfaces to receive the water proofing membrane, applying one coat of hot paving bitumen of penetration value 85/25 conforming to IS 73 @ 1.20 kg/sqm over a coat of bitumenous primer @ 0.30 ltrs per sqm and applying a layers of APP based polymeric membrane, 3mm thick (minimum) weight 3.00 Kg/sqm reinforced with polyster non woven fabric (weighing not less than 150 gms/sqm) shall be applied over Bitumenious primer (Application of polymeric memberane shall be by torch application, over laps shall be minimum 100mm on the transverse direction & 75 mm on the longtudinal direction) polymeric membrane shall be taken to a height of 60 cm (minimum) and then inserted inside the groove of parapet wall and shall be finished by membrane flashing, coved fillet in PCC (1:2:4) type B-0 of radius 75 mm shall be provided at the junction of roof & other vertical surfaces & surfaces shall be painted with hot paving bitumen of penetration value 85/25 conforming to IS 73 @ 1.20 kg/sqm & applying one coat of aluminium paint over the APP modified membrane @ 0.11 kg/sqm complete all as specified and as directed. | 210 | Sqm | 835 ₹1,75,350 | 950 ₹1,99,500 | 840 ₹1,76,400 | 950 ₹1,99,500 | 828 ₹1,73,880 Lowest | 900 ₹1,89,000 | 840 ₹1,76,400 | 845 ₹1,77,450 | 835 ₹1,75,350 |
| 6.00 | Dismantling of AC sheet corrugated / CGI corrugated sheets in roofing any gauge and any thickness including ridge, valley/gutter etc. complete all as specified and directed. | 192 | Sqm | 45 ₹8,640 | 60 ₹11,520 | 50 ₹9,600 | 60 ₹11,520 | 38 ₹7,296 Lowest | 55 ₹10,560 | 45 ₹8,640 | 52 ₹9,984 | 50 ₹9,600 |
| 7.00 | Supply and fixing pre-painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering, fixed with self tapping screws as specified complete all as specified and as directed. | 180 | Sqm | 1,315 ₹2,36,700 | 1,410 ₹2,53,800 | 1,310 ₹2,35,800 | 1,410 ₹2,53,800 | 1,302 ₹2,34,360 Lowest | 1,310 ₹2,35,800 | 1,310 ₹2,35,800 | 1,400 ₹2,52,000 | 1,310 ₹2,35,800 |
| 8.00 | Supply and fixing pre-painted galvalume aluminium zinc coating GI based plain steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering, fixed with self tapping screws as specified complete all as specified and as directed. | 12 | Sqm | 1,310 ₹15,720 | 1,420 ₹17,040 | 1,320 ₹15,840 | 1,420 ₹17,040 | 1,298 ₹15,576 | 1,350 ₹16,200 | 1,350 ₹16,200 | 1,285 ₹15,420 Lowest | 1,305 ₹15,660 |
| 9.00 | Material and labour for preparation of old steel surfaces over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 100 | Sqm | 95 ₹9,500 | 120 ₹12,000 | 100 ₹10,000 | 120 ₹12,000 | 95 ₹9,500 | 110 ₹11,000 | 95 ₹9,500 | 92 ₹9,200 Lowest | 99 ₹9,900 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 733 | Sqm | 115 ₹84,295 | 140 ₹1,02,620 | 120 ₹87,960 | 140 ₹1,02,620 | 101 ₹74,033 Lowest | 120 ₹87,960 | 115 ₹84,295 | 115 ₹84,295 | 119 ₹87,227 |
Tender Value
₹81 L
EMD Value
₹1.5 L
Closing Date
3 Jun 2026, 6:00 pmClosed
COL AMIT CHAUBEY
HQ 137 Wks Engr PIN 914137 c/o 99 APO
SPL REPAIRS TO BLDG No P-53 (OFFR MD ACCN QTR No. O-23/1 to 23/4) IN ZONE G AT MIL STN AGARTALA
2026_MES_761580_2
8137/E8
Open Tender
Civil Works
Item Rate
180 days
Agartala
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
AGE (I) Agartala
₹1.5 L
Yes
6 Jul 2026
20 May 2026
10 Jun 2026
20 May 2026
3 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out complete existing roof treatment from roof surfaces and roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust and removing rubbish at distance not exceeding 50m as per direction of Engineer-in-Charge complete all as specified and as directed. | 210 | Sqm | - | - |
| 2 | Material and labour for Cutting out cracks to V-section in existing RCC roofs or terrace, cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) complete all as specified and directed.
Note: Cutting of grooves will be carried out by using mechanical means like Groove cutter/ wall chaser. | 65 | RM | - | - |
| 3 | Material and labour for 15 mm thick screed bed or bedding layer in CM 1:4 mixed with water liquid proofing compound @ 200 ml per bag of cement on concrete roof surface, finished the surface fair and even to maintain the proper slope of roof surface complete all as specified and as directed.
(Note: Liquid WPC shall be measured and paid separately) | 210 | Sqm | - | - |
| 4 | Material and labour for PCC (1:2:4) type B0 (using 12.50mm graded stone aggregate) mixed with water liquid proofing compound @ 200 ml per bag of cement as in chajjas, rounded or chamfered on edges complete all as specified and as directed.
(Note: Liquid WPC shall be measured and paid separately) | 1.5 | Cum | - | - |
| 5 | M & L for cleaning plastered surfaces to receive the water proofing membrane, applying one coat of hot paving bitumen of penetration value 85/25 conforming to IS 73 @ 1.20 kg/sqm over a coat of bitumenous primer @ 0.30 ltrs per sqm and applying a layers of APP based polymeric membrane, 3mm thick (minimum) weight 3.00 Kg/sqm reinforced with polyster non woven fabric (weighing not less than 150 gms/sqm) shall be applied over Bitumenious primer (Application of polymeric memberane shall be by torch application, over laps shall be minimum 100mm on the transverse direction & 75 mm on the longtudinal direction) polymeric membrane shall be taken to a height of 60 cm (minimum) and then inserted inside the groove of parapet wall and shall be finished by membrane flashing, coved fillet in PCC (1:2:4) type B-0 of radius 75 mm shall be provided at the junction of roof & other vertical surfaces & surfaces shall be painted with hot paving bitumen of penetration value 85/25 conforming to IS 73 @ 1.20 kg/sqm & applying one coat of aluminium paint over the APP modified membrane @ 0.11 kg/sqm complete all as specified and as directed. | 210 | Sqm | - | - |
| 6 | Dismantling of AC sheet corrugated / CGI corrugated sheets in roofing any gauge and any thickness including ridge, valley/gutter etc. complete all as specified and directed. | 192 | Sqm | - | - |
| 7 | Supply and fixing pre-painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering, fixed with self tapping screws as specified complete all as specified and as directed. | 180 | Sqm | - | - |
| 8 | Supply and fixing pre-painted galvalume aluminium zinc coating GI based plain steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering, fixed with self tapping screws as specified complete all as specified and as directed. | 12 | Sqm | - | - |
| 9 | Material and labour for preparation of old steel surfaces over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 100 | Sqm | - | - |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 733 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
2NDTENDERDOC.pdf
Tender Documents • 2.06 MB
BOQ_858625.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .