| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹4.9 LRejected-Finance HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | ₹4.9 L | L2 | Rejected-Finance 2nd |
| 3 | L3₹5.8 LRejected-Finance | ₹5.8 L | L3 | Rejected-Finance 3rd |
| Sl No | Description | Qty | Unit | YOGESH KUMAR CONTRACTOR L2 | KUSHAL CONSTRUCTION AND SUPPLIERS L3 | V K CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling in ordinary soil with ramming, dressing the surface to the required level including lift upto 1.50 m & lead upto 300 m including all cost of labour, material, T&P etc complete | 317.38 | M³ | 120 ₹38,085.60 | 152.06 ₹48,260.80 | 120 ₹38,085.60 |
| 2.00 | Dismantaling C.C. work | 18.78 | M³ | 331.9 ₹6,233.08 | 296.97 ₹5,577.10 | 250 ₹4,695 |
| 3.00 | Earth work excavation in cutting/Lip cutting including lift upto 4 m & lead upto 30 m | 78.51 | M³ | 95.05 ₹7,462.38 | 84.98 ₹6,671.78 | 55 ₹4,318.05 |
| 4.00 | Ordinary centering and shuttering for RCC/CC work i/c all labour,T&P etc complete | 32.43 | M² | 400 ₹12,972 | 500.92 ₹16,244.84 | 350 ₹11,350.50 |
| 5.00 | Anticorrosive/Bitumin painting in two coats on top of sleeper including cost of all material, labour and T&P etc. | 16.45 | M² | 50.65 ₹833.19 | 44.72 ₹735.64 | 30 ₹493.50 |
| 6.00 | Supplying & laying L.D.P.E. film 100 micron including cost of all material, labour and T&P etc. | 527.47 | M² | 35 ₹18,461.45 | 66.19 ₹34,913.24 | 54 ₹28,483.38 |
| 7.00 | Supplying & fixing 10 mm thick thermo coal sheet in expansion joints including cost of all material, labour and T&P etc | 130.2 | Rm | 10.65 ₹1,386.63 | 9.39 ₹1,222.58 | 5 ₹651 |
| 8.00 | Supplying & laying water stop PVC NCL or NCT type seal | 98.9 | Rm | 159.85 ₹15,809.17 | 143.12 ₹14,154.57 | 100 ₹9,890 |
| 9.00 | Laying P.C.C. 1:4:8 with stone ballast including all cost of material, labour, T&P etc complete but excluding centering & shuttering | 2.33 | M³ | 4,700 ₹10,951 | 4,714.01 ₹10,983.64 | 4,500 ₹10,485 |
| 10.00 | Laying C.C. 1:2:4 with stone ballast including all cost of material, labour, T&P etc complete but excluding centering & shuttering | 34.39 | M³ | 5,100 ₹1.8 L | 5,377.73 ₹1.8 L | 4,600 ₹1.6 L |
Tender Value
₹6.4 L
EMD Value
₹13,000
Closing Date
6 Nov 2025, 1:00 pmClosed
Office of the EE ID Moradabad
Office of the EE ID Moradabad
Repairing of damaged lining from Km. 6.910 to Km. 6.941 on LB of RGFC
2025_UPIDC_1086963_18
3646/IDMBD/Etender/2025 Dt 16.10.2025
Open Tender
Civil Works - Canal
20 days
Moradabad
As per NIT
2 documents required · 2 mandatory
₹677
₹13,000
28 Jan 2026
30 Oct 2025
6 Nov 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
Amount
Earth work in filling in ordinary soil with ramming, dressing the surface to the required level including lift upto 1.50 m & lead upto 300 m including all cost of labour, material, T&P etc complete
Dismantaling C.C. work
Earth work excavation in cutting/Lip cutting including lift upto 4 m & lead upto 30 m
Ordinary centering and shuttering for RCC/CC work i/c all labour,T&P etc complete
Anticorrosive/Bitumin painting in two coats on top of sleeper including cost of all material, labour and T&P etc.
Supplying & laying L.D.P.E. film 100 micron including cost of all material, labour and T&P etc.
Supplying & fixing 10 mm thick thermo coal sheet in expansion joints including cost of all material, labour and T&P etc
Supplying & laying water stop PVC NCL or NCT type seal
Laying P.C.C. 1:4:8 with stone ballast including all cost of material, labour, T&P etc complete but excluding centering & shuttering
Laying C.C. 1:2:4 with stone ballast including all cost of material, labour, T&P etc complete but excluding centering & shuttering
Ist class brick work in 1:4 C.M. all cost of material, labour, T&P etc complete
Supplying and laying C.C Tiles lining in single layer on slope in 1:3 C.M. laid on 10mm thick mortar in 1:3 over 100 mm thick C.C. in1:2:4 including all cost of matrial labour T&P required
Construction of porous concrete window including all cost of matrial labour T&P required.
Supplying and filling 10 mm wide expansion joints with bituminous filler.
Ist class brick work 230 mm thick in 1:4 C.M. all cost of material, labour, T&P etc complete
12.50 mm thick plaster 1:4 C.M. i/c all cost of labour, material T&P etc complete
YOGESH KUMAR CONTRACTOR (BID ID -5656315)
KUSHAL CONSTRUCTION AND SUPPLIERS (BID ID -5655549)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1994117.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid