Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
5 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Note: In case, date of tender inviting is on or after date of statutory deadline for audit of balance sheet of previous FY (i.e. 30th Sept or as further extended for this FY), audited balance sheet of 4th previous year shall not be considered unless concerned CA certifies that balance sheet is not audited yet as on date of invitation of this tender.
Contractor/Firm should have Valid Electrical contractor license.
5 conditions · 2 needing a document upload
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer shall submit all relevant documents as detailed in para 14 & 18.10 of Tender Form (Second Sheet) of Part I of GCC work-2022.
The tenderer whether sole proprietor / a company or a partnership firm / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. (Para no. 15 of Tender Form (Second Sheet) of Part I of GCC-2022).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor should quote only the above/below percentage on estimated value, in the space provided at web portal for the purpose & nowhere else. Financial & Technical conditions quoted at any place other than prescribed space shall not be entertained while evaluating the offer.
Tenderer are required to go through the documents attached along with the tender and submit their bids accordingly.
TRD modification work in c/w Design, Engineering, Supply, Installation & Commissioning of Rigid Overhead Catenary System (ROCS) with Transition Element at Hisar of Bikaner Division.
20-TRD-BKN-ETENDER-26-27~NWR
20-TRD-BKN-ETENDER-26-27
Open
Works - General
8 Months
Bikaner, Rajasthan
₹0
₹6.0 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
179 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,09,41,061.98 | ||
| for details. | Item Breakup | — | — | ||
| Design for Rigid OCS, cabling works including return traction cables, longitudinal and transverse bonding cables etc. in stations and ROB, Earth System and other related works. | — | — | — | 10,28,957.42 | |
| for details. | Item Breakup | — | — | ||
| Manufacture and Delivery | — | — | — | 1,70,77,397.23 | |
| — | 0.90 | — | — | ||
| Supply, installation, testing and commissioning of all equipment for Rigid OCS (includes pre-installation tests and post installation tests). (i)All equipment for Earthing & Bonding. (ii)Drilling & anchor bolt installation (underground). (iii)Cantilever installation. (iv)CR installation. (v)Contact wire insertion. | — | — | — | 26,88,363.68 | |
| for details. | Item Breakup | — | — | ||
| Training Obtain the "Notice of No Objection subject to.." from the Engineer for: | — | — | — | 45,220.42 | |
| for details. | Item Breakup | — | — | ||
| MANUALS Obtain the "Notice of No Objection" or "Notice of No Objection subject to.." from the Engineer for Delivery of the final manuals for the traction power, ROCS, SP, SSP, Overall Earthing System before commencement of Integrated Testing and commissioning of the work: | — | — | — | 24,736.71 | |
| — | 7.00 | — | — | ||
| Supply, installation, Testing & Commissioning of spare Stubs for supporting OHE cantilever assembly on both side of ROB & opposite to each other and spare stub bolts for drop arm arrangement on ROB wall/ceiling as per RDSO specification No TI/IN/0041, dated 17.12.2025 or latest. | — | — | — | 76,386.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
TenderDocumentEtenderTRD2026-27.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .