Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
1 Sept 2026, 11:00 am7d left
EXECUTIVE ENGINEER (TUBEWELL)
5, S. N. BANERJEE ROAD, KOLKATA-700013
SINKING OF 02 NOS SMALL DIA TUBEWELLS FITTED WITH SUBMERSIBLE PUMP ALONGWITH DISTRIBUTION AT MOHON BAGAN LANE OR ITS SURROUNDING AREA IN WARD-11 UNDER BOROUGH-II.
2026_KMC_1038483_1
KMC/EE/TW/PD-2/WD-11/01/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
BOROUGH-II
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3,000
18 Aug 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | LABOUR FOR BORING TUBEWELL OF REQUIRED DIA BY WATER JET SYSTEM THROUGH ANY TYPE OF SOIL STRATA INCLUDING HIRE AND LABOUR CHARGES FOR BORING PIPES, SCAFFOLDING, TOOLS AND PLANTS AS NECESSARY AND TAKING OUT THEM AND LOWERING PIPES, STRAINER BLIND PIPE ETC.AND FITTING AND FIXING THE SAME COMPLETE INCLUDING BUCKET WASHING AND OTHER INCIDENTAL WORKS IN THIS CONNECTION. THE TUBEWELL SHOULD HAVE A MINIMUM 50 MM GAP IN BETWEEN THE OUTSIDE OF THE TUBEWELL PIPE AND THE BORE. (A) FOR DEPTH UPTO 150 METER FOR 40MM DIA TUBEWELL WITH TOP ENLARGEMENT OF 100MM DIA. (I) 100MM DIA BORING ETC. (AS PER APPROVAL OF M.I.C. ITEM NO. M-46.4 DATED 23.6.2017.) | 64 | Meter | 449.35 | ₹28,758.4 |
| 2 | LABOUR FOR BORING TUBEWELL OF REQUIRED DIA BY WATER JET SYSTEM THROUGH ANY TYPE OF SOIL STRATA INCLUDING HIRE AND LABOUR CHARGES FOR BORING PIPES, SCAFFOLDING, TOOLS AND PLANTS AS NECESSARY AND TAKING OUT THEM AND LOWERING PIPES, STRAINER BLIND PIPE ETC.AND FITTING AND FIXING THE SAME COMPLETE INCLUDING BUCKET WASHING AND OTHER INCIDENTALWORKS IN THIS CONNECTION. THE TUBEWELL SHOULD HAVE A MINIMUM 50 MM GAP IN BETWEEN THE OUTSIDE OF THE TUBEWELL PIPE AND THE BORE. (A) FOR DEPTH UPTO 150 METER FOR 40MM DIA TUBEWELL WITH TOP ENLARGEMENT OF 100MM DIA. (II) 40MM DIA BORING ETC. (AS PER APPROVAL OF M.I.C. ITEM NO. M-46.4 DATED 23.6.2017.) | 126 | Meter | 155.71 | ₹19,619.46 |
| 3 | CARRYING ETC STORE MATERIALS VIZ PIPE, STRAINER, PUMP ETC FROM STORE TO WORK SITE. (I) FOR DEPTH UPTO 100 M (AS PER APPROVAL OF M.I.C. ITEM NO. M-46.4 DATED 23.6.2017.) | 2 | Each | 992.75 | ₹1,985.5 |
| 4 | SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 23 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction. | 2 | Lump Sum | 1,231 | ₹2,462 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately.(ii) 900 mm. x 600 mm. size of board. | 2 | Each | 813 | ₹1,626 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 64 | Meter | 17 | ₹1,088 |
| 7 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average
depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | - | Meter | 636 | - |
| 8 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, evelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto3,000 mm. but not requiring shoring | 7.05 | Cubic Metre Percent | 192.38 | ₹1,356.28 |
| 9 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 6.75 | Cubic Metre Percent | 77.54 | ₹523.4 |
| 10 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.18 Removal of rubbish, earth etc. from the working site and disposal of thesame Beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning thesite in all respect as per direction of Engineer in charge. | 0.88 | Cubic Metre | 166 | ₹146.08 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_2551132.xls
BOQ • 0.35 MB
form.pdf
Tender Documents • 0.34 MB
techbid.pdf
Tender Documents • 1.24 MB
pricebid.pdf
Additional Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].