Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹35.4 LAdmitted-Fee/PreQual/Technical/Finance 39 1 FIRST CROSS STREET NEDUMARAN NAGAR DHARMAPURI | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹35.7 L+₹34,043.50 (0.96%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹34.0 L
EMD Value
₹34,100
Closing Date
11 Mar 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
REPAIRS AND IMPROVEMENTS TO THE ZONAL OFFICE TOILET AT GROUND FLOOR ,1ST FLOOR AND 2ND FLOOR IN DIV 101 UNIT 23 ZONE 8
2026_CoC_672870_1
Z.O.VIII.C.NO.E1/11739/2025
Limited
Civil Works
Works
270 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,100
12 Mar 2026
10 Mar 2026
12 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and paving second quality colour glazed ...lour cement polishing clearing etc. complete.. | 668 | SQM | 1,825 | ₹12,19,100 |
| 2 | Supplying and Jointing 25mm dia PVC pipe.including...r fixing with necessary scaffolding etc. complete. | 22 | MTR | 203.73 | ₹4,482.06 |
| 3 | Supplying and fixing 51cm colour glazed water clos...ete encasing the W.c. appurtenance etc. complete. | 12 | NOS | 3,914 | ₹46,968 |
| 4 | Supplying and fixing 55cm x 40cm colour glazed was...C.P. pillar tap and other fittings etc. complete. | 12 | NOS | 4,053 | ₹48,636 |
| 5 | Supplying and fixing C.P.screw downtap of size 20mm | 56 | NOS | 362 | ₹20,272 |
| 6 | Supplying and fixing 15mm C.P flush cock. | 9 | NOS | 253 | ₹2,277 |
| 7 | Providing and fixing in position vertically marble...finishing on both sides etc. as directed at site. | 9 | SQM | 2,381 | ₹21,429 |
| 8 | Providing UPVC (Un-Plasticized Polyvinyl Chloride)... | 18 | SQM | 8,313 | ₹1,49,634 |
| 9 | Paving the floor with polished Black Galaxy Granit...c., complete as directed by the Engineer-in-charge | 13 | SQM | 2,459 | ₹31,967 |
| 10 | Supplying and fixing P.V.C. pipe 110mm dia rain wa... plugs etc.complete as directed during execution.. | 112 | MTR | 446.07 | ₹49,959.84 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_808665.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .