| 1 | L1₹33.0 LAccepted-AOC AT NARAHARIPUR PO HENSMYL TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS. | |
| 2 | L2₹28.1 L+₹2,634.32 (0.09%)Rejected-Finance GURUJANGULI CHAINPAL COLONY ANGUL ODISHA | JHARSUGUDA | ODISHA | 768201 | L2 | Rejected-Finance REJECTED NOT BEING L1 | |
| 3 | L3₹28.6 L+₹57,484.74 (2.05%)Rejected-Finance AT PO KANKILI TALCHER DIST ANGUL ODISHA 759100 | ANUGUL | ODISHA | 759100 | L3 | Rejected-Finance REJECTED NOT BEING L1 | |
| 4 | L4₹28.7 L+₹65,774.89 (2.35%)Rejected-Finance | L4 | Rejected-Finance REJECTED NOT BEING L1 | |
| 5 | L5₹33.0 L+₹4.9 L (17.6%)Rejected-Finance | L5 | Rejected-Finance REJECTED NOT BEING L1 |
Tender Value
₹49.4 L
EMD Value
₹61,900
Closing Date
2 Nov 2024, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Providing approach road along with retaining wall for weighbridge (100 tonne static weigh bridge) near field time office under JOCP, Jagannath Area
2024_MCL_319512_1
MCL/GM(JA)/SO(C)/e- Tender/24-25/106, Dtd-21/10/24
Open Tender
Civil Works - Others
Item Rate
60 days
Jagannath OCP
AS PER NIT
3 documents required · 3 mandatory
₹61,900
9 Jan 2025
22 Oct 2024
4 Nov 2024
23 Oct 2024
2 Nov 2024
23 Oct 2024
23 Oct 2024 - 26 Oct 2024
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Ordinary soil Manual Means upto 3 m depth
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth leve 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mmnominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Preparation and consolidation of subgrade with road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with power roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth upto 50 metres.
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Supplying and stacking good quality moorum at work site with all lead and royalty, all complete.
Spreading moorum/sand/ stone dust etc. in layers not exceeding 150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with vibratory roller (Payment to be made for compacted volume of moorum/sand).
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.By Mechanical Means:Grading- I (63 to 45 mm) Using Screening Type-A (13.2mm Agg.)
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. By Mechanical Means:Grading- II (53 mm to 22.4 mm)Using Screening Type-B (11.2mm Agg.)
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications )
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
KRISHNA CHANDRA DHAR
SRIKANTA PRADHAN
M/S. BALAJI BUILDERS
Manoj Kumar Sahoo.
SANTOSH KUMAR DAS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .