| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.7 LAdmitted-Finance 01 KATGHORA ROAD DIPKA DIPKA KORBA DIST KORBA CG | KORBA | CHHATTISGARH | 495119 | -55.11% | ₹36.7 L | L1 | Admitted-Finance |
| 2 | L2₹37.4 L+₹70,369.84 (1.92%)Admitted-Finance 120 RAMAYAN KOSABADI KORBA DIST KORBA CG | GAURELLA PENDRA MARWAHI | CHHATTISGARH | 495119 | -54.25% | ₹37.4 L+₹70,369.84 (1.92%) | L2 | Admitted-Finance |
| 3 | L3₹38.0 L+₹1.3 L (3.59%)Admitted-Finance | -53.50% | ₹38.0 L+₹1.3 L (3.59%) | L3 | Admitted-Finance |
| 4 | L4₹42.1 L+₹5.4 L (14.7%)Admitted-Finance NEAR MIDDLE SCHOOL MD SIYAKAT KHADARAMAL MOHANPUR MAHAGAMA GODDA 814154 JHARKHAND INDIA | MAHAGAMA | GODDA | JHARKHAND | 814154 | -48.50% | ₹42.1 L+₹5.4 L (14.7%) | L4 | Admitted-Finance |
| 5 | L5₹42.4 L+₹5.6 L (15.3%)Admitted-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | -48.22% | ₹42.4 L+₹5.6 L (15.3%) | L5 | Admitted-Finance |
Tender Value
₹96.6 L
EMD Value
₹1.2 L
Closing Date
4 Jun 2026, 5:00 pmClosed
SO(C) CEWS, Gevra
Office of the Staff Officer, CEWS, Gevra PO Gevra Project, Distt.- Korba (CG)
Repair of Drain work of CEWS Gevra.
2026_SECL_359784_1
SECL/CEWS/GVR/SO(C)/ETN/26/02 dated 18.05.2026
Open Tender
Civil Works - Others
Percentage
120 days
Gevra CEWS
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
4 Aug 2026
19 May 2026
6 Jun 2026
19 May 2026
4 Jun 2026
20 May 2026
19 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar with old mughal bricks | 130.8 | cum | 1,081.35 | ₹1,41,440.58 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 672 | cum | 187.35 | ₹1,25,899.2 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 168 | cum | 5,160.65 | ₹8,66,989.2 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 441 | cum | 7,717.7 | ₹34,03,505.7 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,260 | sqm | 563.1 | ₹7,09,506 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 30,870 | kg | 89.75 | ₹27,70,582.5 |
| 1.07 | carriage by mechanical transpot including loading, unloading and stacking. Earth. Lead of 3 km | 466.8 | cum | 180.4 | ₹84,210.72 |
| 1.08 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 672 | cum | 119.65 | ₹80,404.8 |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.51 MB
Tendernotice_3.pdf
PDF • 0.31 MB
BOQ_372656.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .