| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L Quoted ₹2.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 L+₹18,694 (7.98%)Rejected-Finance | ₹2.5 L+₹18,694 (7.98%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.5 L+₹20,379.20 (8.70%)Rejected-Finance | ₹2.5 L+₹20,379.20 (8.70%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | kishan bhadur L2 | Nar Bahadur Works Contractor L1 | TANZIN LAMA CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all kind of soil and classification of soil such as pick work, jumper work, blasting work, saturated soil including chiselling/wedging out of rocks (where blasting work is prohibited) conglomerate rocks and mixed variety of siol etc. up to all leads and lifts stacking the serviceable and unserviceable material seperately and disposal of excavated earth within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. (Pick work 90% & Jumper work 10%) | 9.35 | Cum | 4,500 ₹42,075 | 4,200 ₹39,270 Lowest | 4,400 ₹41,140 |
| 2.00 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20m in pick jumper work. (80% pick work & 20% jumper work) | 3.7 | Cum | 480 ₹1,776 | 470 ₹1,739 Lowest | 490 ₹1,813 |
| 3.00 | Construction of Dry rubble masonry in breast wall and retaining walls revetment walls and parapets etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 38.8 | Cum | 4,600 ₹1,78,480 | 4,200 ₹1,62,960 Lowest | 4,670 ₹1,81,196 |
| 4.00 | Removal of slips in all kind of soil (includig saturated soil but excluding boulders and rocky portion requiring blasting) upto a distance of 20 m, disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface complete within all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 66.4 | Cum | 460 ₹30,544 | 455 ₹30,212 Lowest | 458 ₹30,411.2 |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
22 Jun 2026, 10:30 amClosed
Executive Engineer
Executive Engineer Jal Shakti Division Keylong
C/O dry rubble masonry removal of slips at various RD NDF/2026/80
2026_HPIPH_136461_1
2749-99 dt 10.06.2026 FIS DPF Sindhwari
Open Tender
Civil Works
Item Rate
30 days
Jal Shakti Division Keylong Lahaul Spiti HP
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
EE Keylong
₹3,920
15 Jul 2026
11 Jun 2026
22 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all kind of soil and classification of soil such as pick work, jumper work, blasting work, saturated soil including chiselling/wedging out of rocks (where blasting work is prohibited) conglomerate rocks and mixed variety of siol etc. up to all leads and lifts stacking the serviceable and unserviceable material seperately and disposal of excavated earth within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. (Pick work 90% & Jumper work 10%) | 9.35 | Cum | - | - |
| 2 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20m in pick jumper work. (80% pick work & 20% jumper work) | 3.7 | Cum | - | - |
| 3 | Construction of Dry rubble masonry in breast wall and retaining walls revetment walls and parapets etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 38.8 | Cum | - | - |
| 4 | Removal of slips in all kind of soil (includig saturated soil but excluding boulders and rocky portion requiring blasting) upto a distance of 20 m, disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface complete within all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 66.4 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.21 MB
Form8DPF.pdf
Tender Documents • 1.42 MB
Form6.pdf
Tender Documents • 0.43 MB
TCDPF.pdf
Additional Documents • 0.32 MB
BOQ_201967.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .