Tender Value
₹10.7 L
Closing Date
18 Nov 2021, 2:30 pmClosed
Er Madan lal Chadgal
Executive engineer REW Div Ramban
AS PER NIT
2021_RDPR_146988_17
E NIT NO19 OF REW .Dated03-11-2021
Open Tender
Civil Works
Item Rate
30 days
RAMBAN DISTRICT
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Division Ramban
Exempted
4 Dec 2021
8 Nov 2021
19 Nov 2021
8 Nov 2021
18 Nov 2021
8 Nov 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:5:10 ( 1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size ) Nallah.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:2:4 ( 1 cement :2 fine sand :4 graded stone aggregate 20 mm nominal size ) Nallah.
Providing and laying cement concrete in retaining walls, return walls (any thickness) including attached pilasters , columns , piers , posts, struts butteresses , string or laces , courses , parapets , coping , bed blocks , anchorblocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring , shuttering and finishing.1:3:6 with 30% boulders.( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size)
Provinding and laying in position, specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing and reiforcement. All work up to plinth level.1:1.5:3 (1 cement:1.5 coarse sand :3graded stone agg. 20 mm nominal )
Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars.
providing and laying of 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size ) Cr.
Centring and shuttering including strutting propping etc. and removal of form for Columns, Pillars, piers, abutments, posts and struts
Edges of slabs and breaks in floors and walls under 20cm wide
P/fixing of sign board
VIQAR YOUNAS
Riaz Ahmed Mir
Irshad Ahmed Mir
JIA LAL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .