Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹6,000
Closing Date
28 Sept 2026, 6:00 pm5d left
EE Arki
ARKI DIVISION HPPWD ARKI
Construction of wire crate retaining wall at RD 21/030 to 21/040 and 24/285 to 24/300)
2026_PWD_143857_1
NIT NO. 7452-57 DT. 14.09.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Arki
AS PER SBD
11 documents required · 11 mandatory
₹350
₹6,000
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of surplus excavated earth upto all leads and lifts dressing of sides and bottom and backfilling in trenches with excaveted suitable materials and disposing of unserviceable material, disposed earth to be levelled and neatly dressed as per MORD Specification and as per the direction of Engineer-In-Charge | 17.81 | Cum | 171.4 | ₹3,052.63 |
| 2 | Providing and making gabion structure with mechanically woven double twisted hexagonal shaped wire mesh gabion boxes as per IS 16014:2012, MORTH clause 2500, of required size, mesh type 10x12 (D=100 mm with tolerance of +-2%) zink coated mesh wire diameter 4 mm mechanically edged/selvedged with partitions at every 1 meter interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.20 mm, supplied @3% by weight of gabion boxes, filled with boulders with least diamension of 200 mm, as per drawing and technical specifications Clauses complete | 82.03 | Cum | 3,004.05 | ₹2,46,422.22 |
| 3 | Back filling behind abutment, wing wall and retaining wall of granular material complete as per drawings and technical specifications MORD clause 1204.3.8 including carriage of materials within all leads lifts and as per the direction of Engineer-In-Charge. | 24.38 | Cum | 1,203.3 | ₹29,336.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
4JabalManlogkalan.pdf
Tender Documents • 4.63 MB
BOQ_213895.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .