Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹1,839.15 (1.16%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,956
Closing Date
29 Jul 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627101572 Fencing of R.wall of grayeyard at petimpora bagandar Block Achgoza
2026_RDPR_316932_25
e- NIT No. 57/2026-27 Dated 20-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹3,956
4 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 2 | P/L in position of stone soling/plum/GSB Stone/nallah muck hand packed tightly Including all carriages | - | cum | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 1 | sqm | - | - |
| 4 | 12mm Cement plaster of mix 1:4 | - | sqm | - | - |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | cum | - | - |
| 6 | Structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1 | KG | 1 | ₹1 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade 13.70.1 Two or more coats on new work | 1 | sqm | 1 | ₹1 |
| 8 | Carriage of bricks 25km avg | - | no | - | - |
| 9 | Carriage of Materials Lead 20 Km Sand/Aggregates BY MT | - | cum | - | - |
| 10 | add provision for gate (TO BE PAID ACTUAL) | - | NO | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1036341.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .