Tender Value
₹6.1 L
EMD Value
₹6,140
Closing Date
8 Mar 2024, 5:00 pmClosed
THE BLOCK DEVELOPEMENT OFFICE(VP)
UNION OFFICE,SINGAMPUNARI
Construction of Cremation shed with CC Road at S.Sevelpatti common Purial ground in S.Sevelpatti Panchayat
2024_RDTN_442872_1
B4/3460/2022
Open Tender
Civil Works - Others
Item Rate
120 days
SINGAMPUNARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,140
2 May 2024
6 Mar 2024
8 Mar 2024
6 Mar 2024
8 Mar 2024
6 Mar 2024
Amount
Construction of Cremation shed with CC road at Common Burrial ground in S.Sevalpatti Village and Panchayat in Singampunari Block of Sivagangai District
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION Step etc complete
Earth work excavation from borrow pits for filling in all clause of soild, such as gravelly soil, hard stiff clay, stiff block cotton soil, hard red earth and earth mixed with 50% fair sized boulders and gravelly soil except sand, silt or other loose soils sandy loam etc., as per SS 20 A as per standard specification including spreading sectioning , etc, completed with initial lead and lift for raising and widening the existing road wherever necessary.
Clearing the Light jungle with out uprooting and including all cutting and depositing of the product removed from the site, disposal by burying or burining etc., complete.
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:3:6 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:2:4 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Refilling the basement with excavated earth other than sand complying the Standard specification
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Finishing the roof top with one course of pressed tiles including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:5 mix to 12mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:3 mix to 10mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Colour washing two coats with Emulsion Paint including all cost & conveyance of all materials to site & all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SENTHIL KUMAR M
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .