Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -16.10% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Deficiency of additionality performance security |
Tender Value
₹5.0 L
EMD Value
₹9,940
Closing Date
15 Jul 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Restoration of breached spot of Meemander ladi d/s Grave yard at Village Meemander
2026_IFC_315232_1
e-NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
20 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer
₹9,940
18 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
All kinds of Soil Work | 10.44 | Cum | 479.3 | ₹5,003.89 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 5.79 | Cum | 237.9 | ₹1,377.44 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 6.35 | Cum | 6,591.25 | ₹41,854.44 |
| 4 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded | 3,153.55 | KG | 138.2 | ₹4,35,820.61 |
| 5 | Supply of Nallah Stones | 5.79 | Cum | 700 | ₹4,053 |
| 6 | Carriage of material by Mechanical Transport .
Sand avg. lead of 15km | 2.86 | Cum | 344.49 | ₹985.24 |
| 7 | 20 mm agg. Avg. lead of 15 kms | 5.65 | Cum | 344.49 | ₹1,946.37 |
| 7.01 | Cement avg. lead of 02 kms | 2.03 | MT | 131.06 | ₹266.05 |
| 7.02 | Stone boulder avg lead of 05km | 5.79 | Cum | 236.16 | ₹1,367.37 |
| 7.03 | Steel Avg. lead of 05Kms | 3.15 | MT | 178.43 | ₹562.05 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1021854.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .