| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.4 LAccepted-Finance 0 MUNSHIPURA MUNSHIPURA MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | ₹25.4 L | L-1 | Accepted-Finance L-1 BIDDER |
| 2 | L-2₹28.6 LRejected-Finance | ₹28.6 L | L-2 | Rejected-Finance L-2 BIDDER |
| 3 | L-3₹31.7 LRejected-Finance | ₹31.7 L | L-3 | Rejected-Finance L-3 BIDDER |
| 4 | L-4₹31.9 LRejected-Finance | ₹31.9 L | L-4 | Rejected-Finance L-4 BIDDER |
| Sl No | Description | Qty | Unit | gurudev infra projects limited L3 | Maa Sharda Enterprises L1 | M/S MAA MUNDESHWARI CONSTRUCTION L4 | Utkarsh Enterprises L2 |
|---|---|---|---|---|---|---|---|
| .10Civil Works | |||||||
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 126 | Cum | 150 ₹18,900 | 99 ₹12,474 | 110 ₹13,860 | 80 ₹10,080 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 em in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Hard rock (requiring blasting) | 100 | Cum | 350 ₹35,000 | 110.78 ₹11,078 Lowest | 550 ₹55,000 | 600 ₹60,000 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 167 | Cum | 250 ₹41,750 | 99 ₹16,533 | 120 ₹20,040 | 80 ₹13,360 Lowest |
| 4.00 | Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. | 6 | Cum | 1,000 ₹6,000 | 99 ₹594 | 110.13 ₹660.78 | 50 ₹300 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of entering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 2 | Cum | 6,200 ₹12,400 | 3,999 ₹7,998 Lowest | 5,500 ₹11,000 | 4,500 ₹9,000 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | 9 | Cum | 6,800 ₹61,200 | 3,999 ₹35,991 Lowest | 4,800 ₹43,200 | 4,500 ₹40,500 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 6 | Cum | 6,800 ₹40,800 | 5,599 ₹33,594 Lowest | 7,000 ₹42,000 | 6,400 ₹38,400 |
| 8.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2 | Cum | 6,800 ₹13,600 | 5,599 ₹11,198 Lowest | 8,500 ₹17,000 | 6,600 ₹13,200 |
| 9.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 7 | Cum | 7,200 ₹50,400 | 5,599 ₹39,193 Lowest | 8,500 ₹59,500 | 6,700 ₹46,900 |
Tender Value
₹37.9 L
EMD Value
₹1.1 L
Closing Date
18 Jul 2026, 6:00 pmClosed
SM (E-C), LBSI AIRPORT, VARANASI
AAI, LBSI AIRPORT, VARANASI
Balance work of Construction of Boundary wall and Watch tower at Muirpur Airport, Sonbhadra, U.P.
2026_AAI_281897_1
AAI/MUIR/E-C/BW-WT/NIT-174
Open Tender
Civil Works
Item Rate
180 days
SM (E-C), LBSI AIRPORT
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,180
₹1.1 L
7 Aug 2026
27 Jun 2026
20 Jul 2026
27 Jun 2026
18 Jul 2026
27 Jun 2026
27 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.9 | Civil Works | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 126 | Cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 em in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Hard rock (requiring blasting) | 100 | Cum | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 167 | Cum | - | - |
| 4 | Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. | 6 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of entering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 2 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | 9 | Cum | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 6 | Cum | - | - |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2 | Cum | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 7 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TenderDocument.pdf
Tender Documents • 8.33 MB
BOQ_329294.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].