Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 LAccepted-AOC 6 RAILWAY STATION ROAD ONKAR INDUSTRIES GULAMALI PURA BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹39.1 L+₹1.5 L (3.99%)Rejected-Finance | L2 | Rejected-Finance Not being lowest | |
| 3 | L3₹39.9 L+₹2.3 L (6.11%)Rejected-Finance 53 HOUSING BOARD COLONY PHASE II UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | J K | 182101 | L3 | Rejected-Finance Not being lowest | |
| 4 | L4₹42.1 L+₹4.4 L (11.8%)Rejected-Finance HOUSE NO 108 WARD NO 08 SHAKTI NAGAR DHAR ROAD UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-Finance Not being lowest | |
| 5 | L5₹42.4 L+₹4.7 L (12.6%)Rejected-Finance | L5 | Rejected-Finance Not being lowest |
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
19 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col Sachin Sharma CWE
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
REPAIRS/ MAINT/ SERVICING TO 11 KV MPH HT INSTALLATIONS (BIKRAM, AEE, 10 DOGRA, CHIBBER, 4 PARA, 9 PARA AND GOLF (VIEW) UNDER GE (UTILITIES) UDHAMPUR
2023_MES_603231_1
CWE/U(U)-43/2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
UDHAMPUR
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (UTILITIES) UDHAMPUR
₹84,000
12 Aug 2023
14 Jun 2023
26 Jul 2023
14 Jun 2023
19 Jul 2023
30 Jun 2023
Amount
Excavating in trenches, n exc 1.5 m wide and n.exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, for laying cables/pipes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth in and getting out in any type of soil, complete all as specified and as directed.
Description all as above but depth exceeding 1.5 mtr but not exceeding 3.0 mtr complete all as specified & directed.
Returning, filling in (soil) including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick in any type of soil, complete all as specified and as directed.
Removing excavated material (soils) to a distance exceeding 250m but not exceeding 500m and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified and as directed.
Plain cement concrete (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation, filling and mass concrete all as specified.
Plain cement concrete 1:2:4 type B-1 (using 20mm graded stone aggregate) for coping of poles complete including necessary form work, all as specified and directed.
DWC Pipe ( Double wall corruguated) confirming to IS: 14930(Part-II) along with necessary Snap fit Coupler for interconnection Suitable for HT Cable of size 70/150 sq.mm (90X 76 mm as diameter) all as specified & directed.
Drawing out the SF 6 / RMU/VCBs from the Circuit system of 11 KV , Servicing the Circuit breaker by checking the following parameters VCB Panel Calibration, for proper functioning using CTC for clear off the carbon deposited . a) Checking / fault diagnisis of Isolator & earth switch mechanism slips b) Checking of Gas inside the tank c) Checking the functionality of relay protection system d) Checking the Mechanism of isolator module and vcb module e) Checking the voltage presence indicator f) Checking the comlete control wiring for tripping/ closing / indication system.
Painting to steel tubular swaged pole of Overhead lines (11 Mtr long) complete with and including comprising the following works:- (a) Scraping out wornout old paint and making the surface smooth. (b) Painting the pole and all MS work mounted on pole with two coats of synthetic enameled paint (Aluminium shade) as directed by Engr-in-charge. (c ) Forming five nos coloured bands at lower portion of pole each 300 mm wide alternatively with white and black colour (or any colour as approved by Engr-in-charge)synthetic enameled paint and marking pole no. with black and white paint complete all as specified.
Taking proper shut down in writing and disconnecting the LT and HT electric mains from transformer of capacity 63 KVA to 500 KVA, removing the lid/cover for inspection to facilitate minor repairs at site , replacement of HV/LV bushings of aluminium of required current rating , draining out the transformer oil reassembling the transformer, refilling the transformer oil (new or old) installing, commissioning and testing at site complete, all as specified and directed.
Shifting of transformer of capaicites (63KVA-500KVA) from the Premises of ( CPH Premises) to workshop for necessary repairs. Reshifting the transformer Post repairs from workshop to CPH (Premises) with help of hydra/crane/any other lifting devices.
Taking down the unserviceable / moistured HT Cable from the under ground system. Supply , laying, testing and commissiong of HT Cable XLPE insulated , screened, PVC bedded galvanised steel strip or wire armoured electric power cable ( heavy duty) with aluminium conductor , 11000 volts earthed grade cross sectional area as illustrated below Note :- Retrived HT cable scrap ( Lumpsum ) shall be deposited AGE E/M storeyard with own arrangement by the contractor.
a) 70 sq.mm 3 core
b) 95 sq.mm 3 core
c) 120 sq.mm 3 core
d) 150 sq.mm 3 core
Supply, installation and testing HT gang operated air break switch 11 KV, 3 pole vertically mounted type, mechanically operated, mounted on steel frame with operating mechanism, worked from ground level for current upto 200 Amps with drop out fuse elements of required capacity, GOD/switch having 100 MVA rating at 11 KV and 12 insulators suitable for 11 KV, 50 C/s including mounting on HT poles and necessary electrical connections complete all as specified and directed.
Supply only Spare parts of VCBs ( Make : As Suitability for VCB Crompton Greaves , siemens , ABB Schneiders)
a) Current transformer of capacities 400/200/5/5A.
b) Current transformer of capacities 200/100/5/5A.
Rewinding of HT/LT coil conforming to the original winding of the transformer of any make/capacity with super enamelled cooper wire/strip or DPC copper wire of appropriate gauge and turns including allied materials complete, all as specified and directed.
Dehydration and filteration of existing serviceable transformer oil at site or at factory permisses of any type,any capacity,any rating transformers till it achieves the required dielectric strength upto 50 KV at 2.5mm gap using dehydration plant complete, all as specified and directed.
Topping up of transformer oil of good quality having not less than 50 KV dielectric strength,flash point not less than 135 degree C, having low viscosity for filing complete, all as specified and directed. Make: Savita/Power oil/Servo oil as per IS 335 of 1983 all as specified. Note: Draining out old unserviceable oil & filling process is deemed to be included in quoted rate in respsctive item.
Taking down the old corroded / damaged HT Poles from site including supply and fixing Steel tubular swaged pole erected to truly vertical or planted as strut complete with 6 mm thick MS Base plate,welded to pole,finial taper cap, bolts, nuts, screws,11 Mtr long, type 410 SP - 55,including drilling of holes of required size for fixing of cross arms,painting the exposed surfaces of pole with two coats of aluminium paint over a coat of red oxide zinc chrome primer and with two coats of black bituminous paint on the portion embedded in concrete, and marking pole no. with black paint at suitable height all as specified and directed. Note:- a) Necessary exacavation, foundation and coping shall be measured and paid separately
Cable jointing kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 sqmm complete, all as specified and directed.
Description all as per Srl item No 19 above but size of cable 120 to 185 sqmm.
Cable jointing kit for 11 KV (Earthed) grade cable for heat shrinkable straight through joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 sqmm complete, all as specified and directed.
Description all as per Srl item No 21 above but size of cable 120 to 185 sqmm.
Earthing complete with galvanised steel earth plate electrode 60×60cm.× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised earth strip 25x4 mm by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion inclusive of necessary earth work in any type of soil, charcoal, salt, funnel, PCC pit and RCC cover with handle complete as per electrical plate No. 3 of MES SSR Part-I.
ACSR conductor of required size for Over head lines on poles including streching, tightining of poles insulator with winding wire of suitable size with insulator/streching of ACSR conductor all as specified and directed.
Construction of platform for transformer 3 M(wide)x 3 m (long) & 1.5m (height) including moorum filling, earth work in brickwork any type of soil, brick work in CM (1:6) and PCC at top 10 cm thick (1:2:4) type B-1 and foundation with 1:4:8 type D-2, 25cm thick all as per drawing including plastering to exposed walls and white wash, providing MS channel on top of size 75x40x8mm of 1.5m length for rolling to transformer, including chain link fencing of wire mesh 150x100 size made out 4mm dia GI wire of height 1.5m fixed with the help of MS strip 25x6mm on and including MS angle iron 75x45x6mm thick 12 Nos post by the means of drilling holes at the distance of 30cm and fixed with the help of suitable nut, bolt and washer, the length of MS angle iron not less than 2.25m top of post bend to the shape of 60 degree including 03 Nos cuts for inserting barbed wire including 03 run of barbed wire and including provision of gate of size 1.5mx0.9m made out of MS angle iron 50x50x6mm and MS bar 12mm dia for meshing to the gate and locking arrangement complete all necessary for work, complete all as specified.
Painting of transformer of following capacity with two coats of synthetic enamel paint of grey colour by spray complete including preparation of old surfaces, removing, cleaning of oil, grease etc. all as specified and directed.
(a) 63 KVA to 150 KVA capacity
(b) 150 KVA to 250 KVA capacity
(b) 315 KVA to 500 KVA capacity
Breather ASSY with Silica gel by opening of all nuts and bolts after taking shutdown of transformer and fix breather assy all as per directed and specified.
(a) 63 KVA to 150 KVA capacity
(b) 150 KVA to 250 KVA capacity
(b) 315 KVA to 500 KVA capacity
Lightning arresters expulsion type complete with all fittings, transmission class, discharge capacity 65 kilo amp and supply and fix new Lightning arresters expulsion type complete with all fittings, transmission class, discharge capacity 65 kilo amp .11000 volts all as per specified and directed.
ACSR Conductor of any size from existing over head lines completed and supply, lay and fix aerial bunched cable 11KV grade stranded and compact aluminium phase conductor of size 3x120 sqmm + 1x70 sqmm (bare messenger) with Aluminium alloy. The phase conductor shall be insulated with XLPE (Sioplas) compound Aluminium as per IS-14225-1995 including all fittings such as anchor clamp, suspension clamp, line connector, service clamp, Including End joints insulator piercing connectors, for taps from bare line etc. complete all as specified and as directed.
Earthing with Copper earth plate electrode 600 x 600 x 3 mm buried directly in ground (earth pit not less than 2.25 M deep below ground level) with top edge of the earth plate not less than 1.5 M below ground level connected to Copper strip 20X3 mm thick for earthing lead fixed by means of nuts,bolt,washers etc connected to earth test point complete all as specified in electrical plate No 3 of SSR-2009 part 1, including necessary excavation and earth work in any type of soil, comman salt, charcoal dust, 40 mm dia light grade GI pipe for protection to earth lead, GI water pipe 20mm dia with funnel &wire mesh, PCC pit with CI cover and frame etc complete all as specified and directed. Note: - (i) All the joints shall be made with welding to get proper conductivity. (ii) On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction of Engineer-in-charge.
Taking down the unserviceable Battery bank from the substation . Supply install test and commissiong of Battery bank VRLA Type Sealed maintenance free operating on 110V DC + 110 V AC with (02 Volts-56Nos. Battries) Battery Stand & Inter-Connections.
Taking down the unserviceable Battery Charger from the VCB Panel Supply and fix 110V DC Battery Charger with following specification a) Trickle, Boost Facility system inbuilt. b) Protection system with MCB control 100Amps. c) 230V AC input charger. d) Air cooled rectifier e) Servo control charger.
Surface Dressing/Cleaning of various 11 KV sub-stations free from vegetation of any type including trimming of tree branches, bushes, creepers, etc. complete all as specified & directed. Note: The frequency of surface dressing shall not be less than 2 months
Supply and spread stone aggregate of size 20 mm in sub-stations/electric yards including levelling complete all as specified.
Trimming of tree branches upto 75 mm dia to clear the route of HT/LT over head conductors in switch yards and open joints upto 3m from the conductor including removing the cut branches from site and depositing at places n exc 50m all as directed by Engineer-in-Charge. (Note :- 1. One/more tree branches covering 3m shall be considered as one unit. 2. The frequency of trimming of tree branches shall not be less than 2 months)
shivom builders
vijay kumar gupta and co
slathia construction works
PROACH ASSOCIATES BUILDERS & ENGINEERS
FANGALIA TRADERS
M/S Builders Indias
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .