| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.4 CrAccepted-AOC SC 326 SHASTRI NAGAR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹58.4 Cr Quoted ₹89.5 Cr | L1 | Accepted-AOC Financial bid is accepted at the rate of price Rs. 583840144.00 |
| 2 | L2₹100.6 CrRejected-Finance | ₹100.6 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹101.3 CrRejected-Finance | ₹101.3 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | - | - | Rejected-Technical Rejected |
Tender Value
₹123.0 Cr
EMD Value
₹1.2 Cr
Closing Date
14 Mar 2023, 12:30 pmClosed
SE Bareilly Circle PWD Bareilly
SE Bareilly Circle PWD Bareilly
Widening and Strengthening of Azijganj Chauhanapur Madnapur Road (MDR-105C) In Distt Shahjahanpur Fin Year 2022-23
2023_CEBLY_779535_1
1363/141C (E-Tender)-3/22 dated 02.02.2023
Open Tender
Civil Works - Roads
450 days
Shahjahanpur
As Per Tender Documents
3 documents required · 3 mandatory
₹2,725
₹1.2 Cr
Yes
Bareilly
1 Apr 2023
28 Feb 2023
14 Mar 2023
28 Feb 2023
14 Mar 2023
1 Mar 2023
1 Mar 2023
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embenkment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compacted to meet requirement of table 300-2, MORT&H Specification-305
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, arriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with SS grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per direction fo E/I As per Ref to MoRTH specifications 602 Sr.No 6.2
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing Laying reinforced cement concrete in open foundations & sub-structure complete as per drawings and technical specifications Clause RCC grade M25 using batching mix plant.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Stone Ballast 40 mm gauge filling behind abutment, wing wall & return wall complete as per drawing & technical specification.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Providing Laying reinforced cement concrete in open foundations & sub-structure complete as per drawings and technical specifications Clause RCC Grade M20 using batching plant transit mixer & manual placing
Earthwork in excavationof Foundation of structures as per drawing and technical specifications Clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling with approved material.
Plain Cement Concrete 1:3:6 nominal mix in foundations with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days
Brick masonry work in 1:3 cement mortar in foundation 7 sub-structure complete excluding pointing and plastering as per drawing and technical specifications Clauses
Providing Laying reinforced cement concrete in open foundations complete as per drawings and technical specifications Clause RCC grade M20 using batching mix plant
Supply, Fitting and Placing HYSD bar reinforcement in foundation and substructure complete as per drawings and technical specifications
Supply and filling Local sand as a filter material in abutments including all materials labour T&P cartge staking etc. complete.
Pointing with cement mortar (1:3) on brick work as per drawing and technical specification
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Supply of 350 mm dia hume pipe. As Per NSI No.-5 (iv)
Laying of 350 mm dia hume pipe. As Per NSI No.-5a (iv)
M/S SOBTI INFRATECH LIMITED
M/s PBC Infrastructure India Private Limited
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf