| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-Finance | L-1 | Accepted-Finance Being lowest | |
| 2 | L-2₹4.2 L+₹23,801.40 (5.98%)Rejected-Finance VPO BASDEHRA TEHSIL DISTT UNA HP | L-2 | Rejected-Finance Not Lowest | |
| 3 | L-3₹4.4 L+₹37,538.21 (9.44%)Rejected-Finance D SHALA DISTT KANGRA HP | L-3 | Rejected-Finance Not Lowest | |
| 4 | L-4₹4.7 L+₹73,761.67 (18.5%)Rejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L-4 | Rejected-Finance Not Lowest | |
| 5 | L-4₹47.1 L+₹43.2 L (1085.5%)Rejected-Finance R O VILLAGE PO NANGAL KHURD TEHSIL HAROLI DISTRICT UNA HP | L-4 | Rejected-Finance Not Lowest |
Tender Value
₹4.5 L
EMD Value
₹9,100
Closing Date
21 Sept 2026, 10:30 amClosed
Executive Engineer Haroli Division HPPWD Haroli
Executive Engineer Haroli Division HPPWD Haroli
Restoration of rain damage on Panjawar Bathri road Km 0/0 to 9/00 SH C/o CC pavement at RD 3/160 to 3/200Restoration of rain damage on Panjawar Bathri road Km 0/0 to 9/00 SH C/o CC pavement at RD 3/160 to 3/200
2026_PWD_143351_1
J9 Restoration of rain damage on Panjawar Bathri road Km 0/0 to 9/00 SH C/o CC pavement at RD 3/160
Open Tender
Civil Works
Percentage
Haroli
Please refer to SBD
13 documents required · 13 mandatory
₹350
₹9,100
7 Oct 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying existing granular surface to a depth of 50mm ( fifty millimetre) and disposal of scarified material within any lift and lead as per the direction by the Engineer-in-charge .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. | 220 | Per square metre | 18 | ₹3,960 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height including getting out the excavated soil and disposal of surplus excavated soil as directed, within any all kind of soil including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. | 270 | Per cubic metre | 170 | ₹45,900 |
| 3 | Construction of gravel/soil aggregate sub base/base by providing well graded material of nominal maximum size grading 80mm ( Eighty millimetre) as per table 2.3 of IRC SP 77-2008 spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface mixing by mix in place method at OMC with tractor mount approptiate rotavator attachment and compaction with three wheel 80-100 KN ( Eighty to one hundred Kilo Newton) static roller capacity to achieve the desired density complete as per MORD Technical specification 2014 section-300 contained in para 2.2, 3.6 and 3.7 of IRC SP 77-2008 complete as per technical specification section 400 of caluse 402 for grading -I material including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | 45 | Per cubic metre | 1,100 | ₹49,500 |
| 4 | Providing and laying cement concrete 1:4:8 (one cement: four sand:eight graded crushed stone aggregate 40mm( forty millimeter nominal size) mechanically mixed and curing complete including cost of form work in foundation and plinth in all heights / depths including enitre carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. | 30 | Per cubic metre | 3,400 | ₹1,02,000 |
| 5 | Providing and laying (M-25) (M-twenty five) Grade Design Mix mechanically mixed and vibrated concrete for reinforced cement concrete in foundation upto all depth/heights for all type structure complete of reinforced cement concrete standard concrete design mix of with cement contents not less than 400kg.(four hundred kilogram) per cubic metre and curing and form work complete in all heights complete as required at site which may arise for all heights/ depths including the cost of form work with steel plates as per drawings and technical specification MORD 2014 Clause 802,803,1202,1203 as per the direction of the Engineer-in- chargeincluding carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. | 45 | Per cubic metre | 5,600 | ₹2,52,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_213000.xls
BOQ • 0.26 MB
sbd.pdf
Tender Documents • 6.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .