| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | Not Admitted-Fee/PreQual/Technical CHANDAULI | UTTAR PRADESH | 221009 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹9.1 L
Closing Date
9 Nov 2024, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
RESTORATION AND DEMARCATION OF CHAITY DY. FROM KM. 0.000 TO KM. 18.400 IN DISTRICT KUSHINAGAR
2024_UPIDC_970484_1
09/SE/2024-25
Open Tender
Civil Works
Item Wise
270 days
JATAHA BAZAAR, PADRAUNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,894
₹9.1 L
Yes
6 Dec 2024
1 Nov 2024
9 Nov 2024
1 Nov 2024
9 Nov 2024
1 Nov 2024
Amount
Uprooting of Narkool,Moonj, Gondigrass/ Elephant grass including cost of laour and T&P required for proper completion of work.
Earth work in cutting in correcting internal and external section of canal including all lead & lift, proper disposal, required for proper completion of work.
Earth work in filling in correcting internal and external section of canal including all carriage upto site of work, lead & lift, proper disposal, manual compaction required for proper completon of work. (Filling).
Earth work in filling in making Diversion incliding all lead & lift, proper disposal, manual compaction required for proper completon of work.
Dismantling old, damaged & broken pucca work incl. all cost of labour T&P required for proper completion of work.
Dismantling of R.C.C. work and cement concrete in lime or cement mortar and including stacking of material with a distance of 60m as per direction of Engineer-in-Charge. As per SOR Page No.-24 Item No.-1
Earth work in excavation in foundation for outlet in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work.
Preperation of Subgrades excluding cost of earth work including cost of all labour and T&P required for proper completion of work.
Laying dry brick on edge (solling) including prepration of sub-grade to prescribed slope, filling joint with earth, T&P required for proper completon of work.
Laying C.C. in 1:3:6 in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) including all cost of materials, carriage upto site of work, T&P and labours required for proper completion of work.
Centering and shuttering for CC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Centering and Shuttering for R.C.C. work, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Reinforcement of steel including cutting, bending & binding including all cost of material, labour, T&Petc. proper completion of work.
Laying CC work in M-20 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige upto site of work, T&P and labours required for proper completion of work.
Laying RCC work in M-20 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige upto site of work, T&P and labours required for proper completion of work.
Construction of precast RCC Boundry pillar (150MM X 150MM X 1650MM) with laying LDPE film , fixing pillar,laying M15 concrete in foundation , painting and writing letter for details of canal Boundry Pillars including all cost of material, labour, T&Petc. proper completion of work.
Supplying and Laying Local Sand below C.C. with proper compaction including all materials, labour and T&P, etc required for proper completion of work.
100 mm thick plain Cement Concrete lining in 1:2:4 with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Poviding and Laying in position bitumen mix filler of Proportion of 80 kg hot bitumen,1kg of Cement and 0.25 Cum Coarse sand for Expansion Joint (As Per D.S.R.Item Code 5.27)
1st class brick work in 1:4 cement & coarse sand mortar with M-150 brick, coarse sand including all cost of materials, carrige upto site of work, T&P and labours required for proper completion of work.
M-150 class brick work 1:3 cement & c.sand mortar inincluding complete material labour T&P etc. required for proper completion of work.
Cement pointing in struck and deep in 1:2 cement coarse sand mortor including cost of all material labour T&P etc required for proper completion of work.
Cement Plaster 12.50 mm thick with 1:3 C.M. including complete material labour T&P etc. required for proper completion of work.
Painting/ Finishing wall with Premium Acrylic Smooth exterior paint of required shade: New work (2 or more coat applied @1.67 ltr/10 sqm. over and including primimg coat of exterior primer applied @2.20kg/10 Sqm) (apex Ultima, weather coat All quard) Asian, Berger. including supply of all materials, labour, T&P etc. for proper completion of work.
Construction of precast RCC Wheel ( M20 ) guard (230MM X 230MM X 450MM) with laying LDPE film , fixing guard,laying 1:3:6 concrete in foundation , painting Wheel guard including all cost of material, labour, T&Petc. proper completion of work.
Supplying and Fixing Sign borad at site for notice both side including cost of all material, labour, T&P etc required for proper completion of work.
S/Laying one layerof tar felt or any other equivalent approved material of the junction of wall and roof as per direction E/I including necessary overlap, giving acoat of approved masticpaint below the tar felt and including supply of all maaterials, labour and tools and plants etc, required for proper completion of the work fix as per standard.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material, labour, T&P required for proper completion of work.
Supplying and pitching of Mirzapur stone Boulder upto 25 kg to 60 kg weight at stack yard /cum
Supplying & fixing of head regulator gates of minors including all cost of materials carriage up to site of work, labour and T&P required for proper completion of work.
Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for complete work as directed by Engineer-in-Charge as per I.D. specification.
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specification.
Providing and fixing of 110mm dia HDPE rigid pressure pipe 6 kg/m2 etc including cost of all material labour T&P etc required for proper completion of work.
Providing and fixing of 160mm dia HDPE rigid pressure pipe 6 kg/m2 etc including cost of all material labour T&P etc required for proper completion of work.
Providing & Laying LDPE film on slope below lining including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Construction of precast RCC Boundry pillar (150MM X 150MM X 1650MM) with laying LDPE film , fixing pillar,laying M15 concrete in foundation , painting and writing letter for details of canal Boundry Pillars including all cost of material, labour, T&Petc. proper completion of work.
Painting two coat of paint on steel gate with superior quality paint including cost of all material,labour, T&P etc. required for proper completion of work. (unit=01 m²)
Supplying & Laying Crushed stone grit (4.75mm to 10.00mm size) with all lead ,lift including all cost of materials, carriage upto site of work, T&P and labours required for proper completion of work.
Supplying & Laying Crushed stone grit (10.0 mm to 12.5 mm size) with all lead ,lift including all cost of materials, carriage upto site of work, T&P and labours required for proper completion of work.
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .