| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹1.6 Cr+₹2.4 L (1.56%)Rejected-Finance | ₹1.6 Cr+₹2.4 L (1.56%) | L2 | Rejected-Finance Higer Rate |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
3 Jul 2021, 12:00 pmClosed
Superintending Engineer
Superintending Engineer, U.P.State construction and Infrastructure Development Corporation Ltd., Lekhraj Market-1st, IIIrd floor Indira Nagar Lucknow.
Construction of Auditorium Building of U.P. Sanskrit Sansthan New Hydrabad,Lucknow.(Balance work)
2021_SCIDC_598359_1
204/S.E/LKO-Regi/ E-PRO/21-22
Open Tender
Civil Works
Item Rate
90 days
New Hydrabad
Construction of Auditorium Building of U.P. Sanskrit Sansthan New Hydrabad,Lucknow.(Balance work)
2 documents required · 2 mandatory
₹2,600
UPSCIDCo.ltd.
₹3.1 L
10 Jul 2021
23 Jun 2021
3 Jul 2021
23 Jun 2021
3 Jul 2021
23 Jun 2021
Amount
Labour Work
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.All works up to Plinth level.'In beam,column,lintl,slab etc
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Edges of slabs and breaks in floors and walls Under 20 cm wide
Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (labour only)
Class- 150 brick work in 1:6 cement and C.sand mortar in Super Structure including supply of all materials, labour and T & P etc. required for proper completion of work.
Class- 150 brick work in 1:4 cement and C.sand mortar in Super Structure including supply of all materials, labour and T & P etc. required for proper completion of work.
10mm. Thick Ceiling Plaster with 1:3 cement : C.sand Mortor including supply of all Material, Labour T.&.P. complete of work
12/15mm wall plaster 1:6 cement :coarse sand with groove at junction including cost of material labour T&P etc. G.F.
Providing & Laying Polished Vitrified tiles in Floor/Dado different sizes (thickness to be specified by the manufacturer) with water absorption's less than n 0.08% and conforming IS 15622 of approved make in all Colours and shades, laid on 20mm. Thick 1:4 (1cement : 4 Coarse sand) Including grouting the joints with white cement and matching pigment etc. Complete.Size 600*600 mm.i/c all material labour T&P complete
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills , facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Granite of any colour and shade Area of slab over 0.50 sqm i/c all material labour T&P complete
Same as above but for floor
Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge.Granite work (paid for double moulding only)
Materials
Course sand (Hameerpur)
Brick
Cement PPC (packed in 50 kg bag) make- Birla,Prism, ACC, Mycem,J.P.
TMT steel MS round bar confirming FE-500 I.S.I.
Sonam Sales Corporation
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .