| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹1.4 L (0.90%)Rejected-Finance GONDA | UTTAR PRADESH | 271305 | ₹1.6 Cr+₹1.4 L (0.90%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹9.4 L (5.89%)Rejected-Finance BHADOHI | UTTAR PRADESH | 221301 | ₹1.7 Cr+₹9.4 L (5.89%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.7 Cr+₹10.3 L (6.48%)Rejected-Finance GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹1.7 Cr+₹10.3 L (6.48%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.7 Cr+₹14.2 L (8.88%)Rejected-Finance 201 MAJNAWAN FAIZABAD SADAR FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | ₹1.7 Cr+₹14.2 L (8.88%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
3 Oct 2023, 1:00 pmClosed
Superintending Engineer
Superintending Engineer Rapti Nahar Nirman Mandal 2 Basti UP
Construction of V.R.B. at Km. 85.800 of Rapti Main Canal.
2023_UPIDC_837297_2
Tender Notic 01/SE/2023-24
Open Tender
Civil Works
Item Wise
90 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.4 L
Yes
22 Nov 2023
13 Sept 2023
4 Oct 2023
13 Sept 2023
3 Oct 2023
13 Sept 2023
Amount
E/W in excavation of foundation on channels above 10 cumec discharge including lead upto 30 m and lift upto 1.5 m and its disposal in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc. required for proper completion of work.
E/W in filling for road diversion & ramp including lead upto 30 m and lift upto 1.5 m including manual compaction & dressing to profile in all types of soil including all leads, lifts and proper disposal as per direction of E/I including cost of T&P & labour etc. required for proper completion of work.
Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth in Rapti Main Canal required for proper completion of work including cost of all material,labour and T.&P etc. required for proper completion of work.
Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc.
Cutting, bending , placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc.
Laying C.C.A20 - M-15 with cement (OPC 43 grade),coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
Laying C.C.A20 - M-25 with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
Laying C.C.A20 - M-30 with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
Laying & fixing Joint Filler Board 18mm thick at specified location in different structures required for proper completion of work including cost of all material, T&P & labour etc.
Providing expansion joint in R.C.C including placing of angle iron & M.S Plate and filling sealing compound as per drawing required for proper completion of work, including cost of all material, labour etc.
PVC water stop seal 10mm thick for proper complition of work including cost of all material, labour, T&P etc
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc
E/W in Removing Diversion in all type of soil including lead up to 30m , lift up to 1.50m with manual compation and dressing required for proper completion of work including cost of all T&P, labour etc.
Dismentaling & stacking of brick from edge soling including cost of all T&P, labour etc. required for proper completion of work.
Resoling of old Dismentled Brick on edge soling at approach ramp including cost of all material labour T&P etc. required for proper completion of work.
Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work..
Carrying & laying stone Boulder (Weight from 20-40Kg and min dimension of 200mm) for canal inner slope protection and apron required for proper completion of work including cost of all material, T&P & labour etc.
S/L crushed stone grit 10 to 20 mm size in graded filter required for proper completion of work including cost of labour and T.&P.etc.
S/L crushed stone grit 4.75 to 10 mm size in graded filter required for proper completion of work including cost of labour and T.&P.etc.
S/L coarse sand of F.M not less than 2.0 in graded filter required for proper completion of work including cost of labour and T.&P.etc.
M/ S A P SHUKLA AND COMPANY
M/S Krishna Construction
M/s VIJENDRA PRATAP SINGH
M/S V.K. CONSTRUCTION
SHIVAM ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .