Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.6 CrAccepted-Finance | ₹97.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹109 CrRejected-Finance | ₹109 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹109.6 CrRejected-Finance PLOT NO 46 SHIVSAMPADA MUTHACOLONY SADAR BAZAR SATARA 415001 | SATARA | MAHARASHTRA | 415001 | ₹109.6 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹123.1 CrRejected-Finance | ₹123.1 Cr | L4 | Rejected-Finance L4 |
| 5 | L6₹127.5 CrRejected-Finance | ₹127.5 Cr | L6 | Rejected-Finance L6 |
Tender Value
₹104.6 Cr
EMD Value
₹1.0 Cr
Closing Date
21 Feb 2022, 5:00 pmClosed
Executive Engineer P.W.Division A.nagar
Office of Executive Engineer P.W.Division A.nagar
EPC13 Improvements to SH 117 to Adarki Mirgaon Phaltan Road SH 149 km 0/0 to 21/00 Tal. Phaltan, District Satara
2022_PWADB_754377_12
ADB 01/2021-22_1
Open Tender
Civil Works - Roads
730 days
Satara
Please refer Tender documents.
8 documents required · 8 mandatory
₹23,600
₹1.0 Cr
Yes
Chief Engineer (Kokan) and Project Director (EAP),
1 Feb 2023
7 Jan 2022
21 Feb 2022
7 Jan 2022
21 Feb 2022
7 Jan 2022
31 Jan 2022
Amount
EPC 13 - Improvements of SH-149 Road from SH 117 to Adarki Mirgaon Phaltan Road, Reconstruction, Widening and Strengthening of existing carriageway in the section of SH-149 from Km 0/000 to 21/000 (Length-21 Km) to two lanes with paved shoulders standards in Tal. Phaltan Dist. Satara, Maharashtra on Engineering, Procurement and Construction (EPC) mode.
R.S.Kamthe Infrastructure Developers Pvt. Lmt.
A S DESAI INFRASTRUCTURE PVT LTD
RAJ PATH INFRACON PVT LTD
Sharda Construction and Corporation Pvt Ltd
Sonai Infrastructure Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid