| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹10.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.06% | ₹10.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.03% | ₹10.6 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.6 L
EMD Value
₹10,600
Closing Date
26 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER UPSIC PRAYAGRAJ
EXECUTIVE ENGINEER UPSIC PRAYAGRAJ
Renovation Repair work in Veer Bahadur Singh Purvanchal University Jaunpur campus and residential complex District Jaunpur
2026_MSME_1151714_1
402/UPSIC/PRYCIVIL/2026-27
Open Tender
Civil Works
Percentage
90 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER UPSIC PRAYAGRAJ
₹10,600
29 May 2026
21 May 2026
26 May 2026
21 May 2026
26 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scraping and Rubbing of Old Painting including disposal of malwa From site including Labour T&P etc Complete | 2,031.65 | Sqm. | 14.52 | ₹29,499.56 |
| 2 | Two Coat Birla Putty including all material Labour T&P Complete. | 609.5 | Sqm. | 114.7 | ₹69,909.65 |
| 3 | Two Coat OBD Painting i/c material , labour T&P complete | 2,031.65 | Sqm. | 136.45 | ₹2,77,218.64 |
| 4 | Two coat Apex Painting i/c all Labour material T&P Complete. | 1,779.68 | Sqm. | 125.76 | ₹2,23,812.56 |
| 5 | Two coat Enamal Painting i/c all Labour material T&P Complete. | 119.51 | Sqm. | 166.29 | ₹19,873.32 |
| 6 | Dismentling Of Existing Plaster Including Disposal of refuse as directed by engineer-In-Charge I/c all material , labour T&P complete. | 406.33 | Sqm. | 83.31 | ₹33,851.35 |
| 7 | 12 mm plaster work with (1:6) cement , sand mortar I /c all material labour T&P complete. | 406.33 | Sqm. | 290.58 | ₹1,18,071.37 |
| 8 | Two Coat Birla Putty including all material Labour T&P Complete. | 406.33 | Sqm. | 114.7 | ₹46,606.05 |
| 9 | Cement Concrete Slab Flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate) Finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc. Complete. | 179.27 | Sqm. | 565.66 | ₹1,01,405.87 |
| 10 | Supply and fixing of Flush Door i.c all Labour material T&P Complete. | 8.4 | Sqm. | 1,758.6 | ₹14,772.24 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_2157276.xls
BOQ • 0.30 MB
402.pdf
Additional Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].