Loading…
Loading…
Tender Value
₹14.0 L
EMD Value
₹28,100
Closing Date
17 Oct 2026, 10:30 am
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Need based repair / servicing of EOT Cranes in Steel Melt Shop of Melting Maintenance Shop.
RWF-M-OT-MMS-2026-27-71RT~RWF
RWF-M-OT-MMS-2026-27-71RT
Open
Works - General
30 Months
Bengaluru Urban, Karnataka
₹0
₹28,100
25 Sept 2026
25 Sept 2026
3 Oct 2026
16 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,10,000 | ||
| — | 1.00 | — | — | ||
| 1. Dismantling of coupling fasteners.2. Dismantling of Gearbox cover fasteners. 3. Dismantling of Brake units. 4. Arrangement of diversion pulleys on the roof.5. Connecting of winch motor wire rope through diversion pulleys on to the gearbox.6. Removal of gearbox cover & placement on the crane girder.7. Lifting of Sun planetary mechanism through winch mechanism and lowering on to the ground. 8. Lifting of MH2 input shaft assembly through winch mechanism and lowering on to the ground.9. Pressing out of Brake drum from sun pinion shaft. 10. Dismantling of planetary gear assembly. 11. Removal of used sun pinion shaft and fitment of new shaft.12. Removal of defective bearings, gears. 13. Fitment of new bearings and gears. 14. Removal of old oil seals and fitment of new oil seals on to bearing covers.15. Assembly of planetary mechanism.16. Preheating of brake drum and pressing on to the sun pinion shaft. 17. Pressing out of brake drum from MH2 input shaft assembly.18. Replacement of oil seals, bearings of MH2 input shaft and pressing of brake drum on to the shaft. 19. Removal of used old oil from the gearbox and cleaning inside body of gearbox. 20. Lifting of sun planetary gear assembly with winch motor assembly and placing into the gearbox. 21. Placement of gearbox cover onto the gearbox & fitment of fasteners.22. Connecting of gearbox brake drums to motor couplings of MH1&MH2. 23. Alignment of MH1&MH2 motors with gearbox. 24.Filling up of new gearbox oil & trial run. | — | — | — | 1,10,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf Part V Schedule of work
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
Part VIII GCC
ATTACHMENT
PartIOfferletter.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .