Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.2 CrRejected-Finance SANKARPUR ROAD BIRUBARI GUWAHATI DIST KAMRUP M ASSAM 781016 | KAMRUP METRO | ASSAM | 781016 | ₹2.2 Cr | L2 | Rejected-Finance Not admitted |
| Sl No | Description | Qty | Unit | SUMIT CHACHAN L2 | M/S MOUSUMI ENTERPRISE AND JV L1 |
|---|---|---|---|---|---|
| 1.00Jungle Clearance | |||||
| 1.01 | Cutting jungles and trees upto 50 cm girth including uprooting roots and stumpsand removing them from site of work etc, complete as directed. i)Heavy jungles for Main & Branch Canal | 1,100 | sqm | 42.1 ₹46,310 | 42.1 ₹46,310 |
| 2.00Construction of Pump House | |||||
| 2.01 | River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified. (Rooms & Verandah) | 11.34 | cum | 2,066.17 ₹23,430.37 | 2,066.17 ₹23,430.37 |
| 2.02 | Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
(A) In ordinary soil in (Rooms & Verandah): Footing | 20.25 | cum | 707.83 ₹14,333.56 | 707.83 ₹14,333.56 |
| 2.03 | Plain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately). (A) With hard blasted boulder: In Rooms & Verandah Footing & Tie Beam | 2.05 | cum | 7,422.82 ₹15,216.78 | 7,422.82 ₹15,216.78 |
| 2.04 | CC in RCC work as specified and directed and including curing etc. (reinforcemcnt and shuttering will be measured and paid separately), the fine aggregate shall be approved clear river sand of coarse variety and shall be 5 mm downward and not to be pass through a 25 IS sieve (width of apparatus is 0.25 mm) the coarse aggregate shall be cubical, hard perfectly clean and free from clay and adherents impurities and chemically inter broken stone chips of approved quantity and shall pass through 19 mm mesh without squeezing and be retained on 15 mm mesh. The fine and coarse aggregate shall be well graded and evenly distributed between the limits and mixes shall be made with adequate quantity of clean water required to have the strength as specified in IS Code.The rate is inclusive of cost of cube test before starting the work ie. 3 nos. per each lot of cement as directed and specified. In the ties and plinth beam in foundation shaped testing of column pile cap base slab retaining walls of septic tank inspection pit intercepting trap yard gully including formation of trap slap of septic tank etc. upto plinth level in prop 1:2:4. In Rooms & Verandah (Footing & Tie Beam,Plinth ,Slab,Column,Lintel,Roof & Truss) | 12.35 | cum | 8,946.68 ₹1.1 L | 8,946.68 ₹1.1 L |
| 2.05 | Supplying fitting ,fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. In Rooms & Verandah (Footing & Tie Beam,Plinth ,Slab,Column,Lintel,Roof & Truss) | 11.39 | Qtl | 13,261.44 ₹1.5 L | 13,261.44 ₹1.5 L |
| 2.06 | Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). In Rooms & Verandah (Footing & Tie Beam,Plinth ,Slab,Column,Lintel,Roof & Truss) | 116.67 | sqm | 225.43 ₹26,300.92 | 225.43 ₹26,300.92 |
| 2.07 | 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) In proportion 1:4 In Rooms & Verandah (long & short walls,front & back slopping roof and deductions of doors and windows are also included in total quantity) | 4.55 | cum | 13,115.9 ₹59,677.35 | 13,115.9 ₹59,677.35 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
1 Nov 2025, 2:00 pmClosed
Chief Engineer Irrigation Assam
O-o the Chief Engineer Irrigation Assam Chandmari Guwahati-3
Renovation of I.I.S from KRB and SRB under Raha LAC under SOPD-G for the year 2025-26 of Nagaon Batadrava Raha Barhampur Div (I) Nagaon Pkg_2
2025_ID_47941_2
2 (SOPD-G) 2025-26 Date_09.10.2025
Open Tender
Civil Works
180 days
Raha
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,500
₹4.4 L
Yes
o-o the Chief Engineer Irrigation Assam Chandmari
18 Dec 2025
10 Oct 2025
3 Nov 2025
10 Oct 2025
1 Nov 2025
17 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Biddocument.pdf
Tender Documents • 0.90 MB
BOQ_76362.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid