Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.0 LAdmitted-Finance | -15.00% | ₹16.0 L | L1 | Admitted-Finance |
| 2 | L2₹16.1 L+₹1,886.64 (0.12%)Admitted-Finance | -14.90% | ₹16.1 L+₹1,886.64 (0.12%) | L2 | Admitted-Finance |
Tender Value
₹18.9 L
EMD Value
₹38,000
Closing Date
28 May 2026, 5:00 pmClosed
VICE CHAIRMAN GHAZIABAD DEVELOPMENT AUTHORITY
GDA OFFICE VIKAS PATH GHAZIABAD
Horticulture maintenance works of 04 nos park, 01 nos park of B-Block, 02 parks of H-Block and 01 park of Industrial area of Indraprastha scheme for a period of two years.
2026_GDAUP_1143858_1
105/Horticulture/2026 Date 29-04-2026 (S.n.-1)
Open Tender
Miscellaneous Works
Percentage
790 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,009
AS PER LINK PROVIDED IN TENDER DOCUMENT
₹38,000
25 Jul 2026
30 Apr 2026
30 May 2026
2 May 2026
28 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m: 2.28.1 All kinds of soil. DSR 2020 (23.80x0.90=21.42x111/100 = 23.77) | 7,450 | sqm | 23.77 | ₹1,77,086.5 |
| 2 | Trenching in ordinary soil upto a depth of 30cm including removal and stacking of serviceable materials and then disposing of by spreading and neatly levelling with in a lead of 50m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). 2.1/D.S.R. 2020 (78.10x0.90 = 70.29x111/100 =78.02) | 2,235 | cum | 78.02 | ₹1,74,374.7 |
| 3 | Rough dressing the trenching ground including breaking colds. 2.5/D.S.R. 2020 (1.50x0.90 = 1.35x111/100 =1.49) | 7,450 | sqm | 1.49 | ₹11,100.5 |
| 4 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 km lead complete (Cattle manure measured in stacking will be reduced by 8% for payment). 2.25/D.S.R. 2020 (247.50x0.90=222.75x111/100 = 247.25) | 318 | cum | 247.25 | ₹78,625.5 |
| 5 | Fine dressing the grounding. 2.7/D.S.R. 2020 (3.70x0.90=3.33x111/100 = 3.69) | 7,450 | sqm | 3.69 | ₹27,490.5 |
| 6 | Spreading of sludge, dump manure or/and good earth in required thickness (cost of sludge, dump manure or/and good earth to be paid separately). 2.8/D.S.R. 2020 (52.35x0.90=47.11x111/100 = 52.29) | 150 | cum | 52.29 | ₹7,843.5 |
| 7 | Grassing with selection No-1 ‛Doob’ grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thicks lawn free from weeds and fit for mowing including supplying good earth if needed (the good earth shall be paid for separately). In rows 5cm apart in either direction. 2.10.1/D.S.R. 2020 (17.70x0.90=15.93x111/100 = 17.68) | 5,950 | sqm | 17.68 | ₹1,05,196 |
| 8 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge2.35/DSR 2020 (50.80x0.90=45.72x111/100 = 50.75) | 1,190 | sqm | 50.75 | ₹60,392.5 |
| 9 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia and 45 cm dep. 2.14.4/D.S.R. 2020 (18.70x0.90=16.83x111/100 = 18.68) | 2,500 | nos | 18.68 | ₹46,700 |
| 10 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 60 cm dia and 60 cm dep. 2.14.3/D.S.R. 2020 (43.75x0.90=39.375x111/100 = 43.70) | 500 | nos | 43.7 | ₹21,850 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_2136979.xls
BOQ • 0.29 MB
105_1.pdf
Tender Documents • 1.24 MB
TenderDate_Extend.pdf
PDF • 0.08 MB
TenderDate_Extend.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .