Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 CrAccepted-AOC | ₹7.3 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹7.8 Cr+₹51.3 L (7.08%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹7.8 Cr+₹51.3 L (7.08%) | 2 | Rejected-AOC 2 |
Tender Value
₹8.2 Cr
EMD Value
₹16.5 L
Closing Date
9 Jun 2023, 3:00 pmClosed
ARVIND Rohilla
EE PHE Division No. 1 Kaithal
Laying of sewerage network and construction of manhole and all other works contingent thereto
2023_HRY_284597_1
20239DA9198D CCAC 474E A091 FDF6A5D7D068594PUH
Open Tender
Civil Works
Works
2 days
PHARAL
2 documents required · 2 mandatory
₹20,000
₹16.5 L
Yes
21 Aug 2023
24 May 2023
9 Jun 2023
24 May 2023
9 Jun 2023
24 May 2023
Amount
Supplying and installation of RCC Vent shafts complete in all respect as per satisfaction of the Engineer-in-Charge complete in all respect
Providing lowering in trenching to correct gradient and alignment, jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS code 458:2003 into trences for all depths and laying out the same to correct alignment, gradient levels etc. cutting of concrete beds and jointing holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and untill the surrouding benchings, haunches and envelopes are completed. The pipe shall rest on beds at all joints through their lengths and to ensure this, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer incharge including all cartge etc. complete in all respect. 500 mm i/d pipe with inside HDPE lining.
Operation and Maintenance of Water works and Raw water pumping station complete scope of work mentioned in the DNIT Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
SH. ANURAG GOEL CONTRACTOR(GSTN-06AQXPG7772Q1ZN)
Sh.Jasveer Singh Dahiya(GSTN-NA)
SH. ANURAG GOEL CONTRACTOR
SH. ANURAG GOEL CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .