Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.1 L+₹8,547 (1.41%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MJ Infrastructures L1 | SRII BALAJI CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 13 | m3 | 116 ₹1,508 Lowest | 120 ₹1,560 |
| 2.00 | Dismantling the damaged Cement mortar concrete wall work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 4 | m3 | 534 ₹2,136 Lowest | 540 ₹2,160 |
| 3.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 7 | m3 | 135 ₹945 Lowest | 140 ₹980 |
| 4.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 17 | m3 | 181 ₹3,077 Lowest | 190 ₹3,230 |
| 5.00 | Clean removal of cement plaster from wall work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 300 | m2 | 9 ₹2,700 Lowest | 10 ₹3,000 |
| 6.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 41 | m3 | 68 ₹2,788 Lowest | 70 ₹2,870 |
| 7.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 19 | m3 | 5,590 ₹1,06,210 Lowest | 5,600 ₹1,06,400 |
| 8.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 46 | m2 | 489 ₹22,494 Lowest | 500 ₹23,000 |
| 9.00 | Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | m3 | 6,319 ₹37,914 Lowest | 6,700 ₹40,200 |
| 10.00 | Wall plastering for using cement mortar 1:5(One part of cement, five parts of sand by volume) thickness 12 mm (average) for all internal/external surfaces for drains etc., finished smoothly to one level including curing etc., complete, at all leads and at all heights. | 416 | m2 | 292 ₹1,21,472 Lowest | 300 ₹1,24,800 |
Tender Value
₹7.3 L
EMD Value
₹7,250
Closing Date
26 Jun 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Providing of CC flooring at Karumalaichettipalayam Pattukottai Kalyanasundaram Street and Jeeva Street in Ward no 75 of West Zone.
2025_MAWS_571307_32
E2/WestZone/2025
Open Tender
Civil Works
Works
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹7,250
25 Mar 2026
20 Jun 2025
27 Jun 2025
20 Jun 2025
26 Jun 2025
20 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_683317.xls
BOQ • 0.32 MB
Building.pdf
Additional Documents • 0.67 MB
CONDITIONS.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .