Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC FIROZABAD | UTTAR PRADESH | 224172 | L1 | Accepted-AOC a | |
| 2 | L2₹3.5 L+₹5,000 (1.44%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | m/s R.S. CONTRACTOR L1 | M/S NETRAPAL SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | E/W in excavation in Foundation | 13 | cum | 100 ₹1,300 Lowest | 100 ₹1,300 Lowest |
| 2.00 | C.C.in 1:3:6 (cement:c/sand:Stone grit) in foundation | 5.8 | cum | 5,623.8 ₹32,618.04 Lowest | 5,623.8 ₹32,618.04 Lowest |
| 3.00 | B/W in 1:6 in Cement Mortar | 21 | cum | 6,273.9 ₹1,31,751.9 Lowest | 6,273.9 ₹1,31,751.9 Lowest |
| 4.00 | R.C.C.in 1:1.5:3(cement: c/sand: Stone grit) | 3.2 | cum | 7,208.55 ₹23,067.36 Lowest | 7,208.55 ₹23,067.36 Lowest |
| 5.00 | Bending, binding cutting and placing of reinforcement including cost of binding wire including cost of steel. | 0.35 | MT | 88,163 ₹30,857.05 Lowest | 88,163 ₹30,857.05 Lowest |
| 6.00 | Ordinary centering and shuttering for C.C./R.C.C. work | 28 | sqm | 575 ₹16,100 Lowest | 575 ₹16,100 Lowest |
| 7.00 | 12mm Cement plaster in 1:4 (1cement:4coarse sand) mortar complete. | 155 | sqm | 204 ₹31,620 Lowest | 204 ₹31,620 Lowest |
| 8.00 | Finishing walls with exterior emulsion paint ….proper completion of work. | 155 | sqm | 140 ₹21,700 Lowest | 140 ₹21,700 Lowest |
| 9.00 | Painting two coat over priming coat …...proper completion of work. | 4 | sqm | 154 ₹616 Lowest | 154 ₹616 Lowest |
| 10.00 | Laying 4.0 cm th. C.C. Flooring | 35 | sqm | 390 ₹13,650 Lowest | 390 ₹13,650 Lowest |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
9 Feb 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer, Lower Division Agra Canal Agra 139, mall road pratap pura agra
CONSTRUCTION OF CHOKIDAR ROOM AT MALIKPUR MINOR HEAD
2022_UPIDC_763927_20
09/EE/2022-23
Open Tender
Civil Works
Item Rate
90 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
₹7,000
17 Sept 2025
3 Feb 2023
9 Feb 2023
3 Feb 2023
9 Feb 2023
3 Feb 2023
Amount
E/W in excavation in Foundation
C.C.in 1:3:6 (cement:c/sand:Stone grit) in foundation
B/W in 1:6 in Cement Mortar
R.C.C.in 1:1.5:3(cement: c/sand: Stone grit)
Bending, binding cutting and placing of reinforcement including cost of binding wire including cost of steel.
Ordinary centering and shuttering for C.C./R.C.C. work
12mm Cement plaster in 1:4 (1cement:4coarse sand) mortar complete.
Finishing walls with exterior emulsion paint ….proper completion of work.
Painting two coat over priming coat …...proper completion of work.
Laying 4.0 cm th. C.C. Flooring
P/L integral cement based water proofing treatment BIRCK KOBA including preparation of surface as required for treatment of roofs, consisting of…………….comp. of the work
Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 ….. complete.
Providing and fixing of steel gate Window
Providing and fixing on wall face unplasticised 110mm Rigid PVC rain water pipes conforming to IS : 13592 Type A,
Supply and fixing hexagonal/Round G.P.fan box of approved make made ….... proper completion of the work.
Providing and fixing glass strips of 4mm thick in joints of floor and skirting at the time fo laying Including labour, T&P etc. complete in all respect.
Signboard with painting latter and writing
M/S NETRAPAL SINGH CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .