Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAdmitted-Finance 1 KHAIRUNISA COMPOUND OPP GANESH MANDIR CHINCHOLI BUNDER ROAD MALAD WEST MUMBAI 400064 | MUMBAI | MUMBAI | MAHARASHTRA | 400064 | ₹40.1 L | L1 | Admitted-Finance |
| 2 | L2₹40.1 LAdmitted-Finance A 301 SHIV PARVATI G D AMBEKAR MARG PAREL MUMBAI 400 012 | MUMBAI | MUMBAI | MAHARASHTRA | 400012 | ₹40.1 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Affidavit and Mfg,authorized dealership not submitted as per NIT |
| Sl No | Description | Qty | Unit | G.S.Commercial Corporation L2 | AQUA FLOW ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00Annual maintenance for chlorinators at Nashik (Satpur) WTP. ( As per Schedule "B" | |||||
| 1.01 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. | 24 | Job | 6,500 ₹1.6 L | 6,500 ₹1.6 L |
| 1.02 | Supply, Installation and testing of Vacuum Regulator including labour, material etc. complete as per the direction of Engineer-in-charge. | 4 | Number | 8,250 ₹33,000 | 8,250 ₹33,000 |
| 1.03 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. | 4 | Set | 5,625 ₹22,500 | 5,625 ₹22,500 |
| 1.04 | Supply, Installation and testing of gas flow meter Cap.20 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge.. | 4 | Number | 17,400 ₹69,600 | 17,400 ₹69,600 |
| 1.05 | Supply, Installation and testing of 100 mm Dial vacuum gauge with PVC isolator including labour, material etc. complete as per the direction of Engineer-in-charge.. | 4 | Number | 6,250 ₹25,000 | 6,250 ₹25,000 |
| 1.06 | Supply, Installation and testing of 100 mm Dial Water presure gauge including labour, material etc. complete as per the direction of Engineer-in-charge. | 4 | Number | 3,750 ₹15,000 | 3,750 ₹15,000 |
| 1.07 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. | 4 | Number | 2,800 ₹11,200 | 2,800 ₹11,200 |
| 1.08 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge. | 4 | Set | 7,500 ₹30,000 | 7,500 ₹30,000 |
| 1.09 | Supply, Installation and testing of control valve set including labour, material etc. complete as per the direction of Engineer-in-charge. | 4 | Number | 3,875 ₹15,500 | 3,875 ₹15,500 |
Tender Value
₹40.1 L
EMD Value
₹40,100
Closing Date
10 Apr 2026, 11:00 amClosed
SE, Nashik
Satpur Nashik
M and R to WSS at Nashik Satpur, Sinnar, Vinchur, Addl. Dindori and Malegaon Sayane Industrial Area.. Annual maintenance for chlorinators Rs. 4009800.00
2026_MIDC_1291095_1
M and R to WSS at Nashik Satpur, Sinnar, Vinchur, Addl. Dindori and Malegaon Sayane Rs. 4009800.00
Open Tender
Civil Works
satpur nashik
Please Refer Tender Document
2 documents required · 2 mandatory
₹10,030
₹40,100
16 Apr 2026
28 Mar 2026
13 Apr 2026
28 Mar 2026
10 Apr 2026
4 Apr 2026
28 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Annual maintenance for chlorinators at Nashik (Satpur) WTP. ( As per Schedule "B" | ||||||
| 1.01 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. | - | Job | - | - | 2 |
| 1.02 | Supply, Installation and testing of Vacuum Regulator including labour, material etc. complete as per the direction of Engineer-in-charge. | - | Number | - | - | 3 |
| 1.03 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. | - | Set | - | - | 4 |
| 1.04 | Supply, Installation and testing of gas flow meter Cap.20 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge.. | - | Number | - | - | 5 |
| 1.05 | Supply, Installation and testing of 100 mm Dial vacuum gauge with PVC isolator including labour, material etc. complete as per the direction of Engineer-in-charge.. | - | Number | - | - | 6 |
| 1.06 | Supply, Installation and testing of 100 mm Dial Water presure gauge including labour, material etc. complete as per the direction of Engineer-in-charge. | - | Number | - | - | 7 |
| 1.07 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. | - | Number | - | - | 8 |
| 1.08 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge. | - | Set | - | - | 9 |
| 1.09 | Supply, Installation and testing of control valve set including labour, material etc. complete as per the direction of Engineer-in-charge. | - | Number | - | - | 10 |
stage.html
html • 0.03 MB
techsummary_2219372.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TenderDocument.pdf
Tender Documents • 0.35 MB
ItemSpecification.pdf
Other Document • 0.04 MB
BOQ_2219372.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid