Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5,723.52Admitted-Finance | -26.21% | ₹5,723.52 | L1 | Admitted-Finance |
| 2 | L2₹5,929.07+₹205.55 (3.59%)Admitted-Finance | -23.56% | ₹5,929.07+₹205.55 (3.59%) | L2 | Admitted-Finance |
| 3 | L3₹5,972.51+₹248.99 (4.35%)Admitted-Finance | -23.00% | ₹5,972.51+₹248.99 (4.35%) | L3 | Admitted-Finance |
| 4 | L4₹5,987.24+₹263.72 (4.61%)Admitted-Finance | -22.81% | ₹5,987.24+₹263.72 (4.61%) | L4 | Admitted-Finance |
| 5 | L5₹6,072.56+₹349.04 (6.10%)Admitted-Finance | -21.71% | ₹6,072.56+₹349.04 (6.10%) | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
13 Jul 2026, 6:00 pmClosed
COMMISSIONER, MUNICIPAL BOARD NATHDWARA
SUKHADIYA NAGAR, NATHDWARA, DIST.- RAJSAMAND 313301
Renovation and Repair work of Iron Jalli and Other Iron structure at different places in ward no. 16 to 30, Municipal Board Nathdwara (ARC)
2026_DLB_573413_1
NIT NO 31/2026-27 CONSTRUCTION LETTER REF No. 3958 DATED 06.07.2026
Open Tender
Civil Works
Percentage
365 days
Nathdwara
As per Nib document and conditions.
2 documents required · 2 mandatory
₹500
Commissioner, M.B. and MD Risl
₹20,000
Yes
16 Jul 2026
6 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below Cement Concrete Grade M-15 and above and PCC blocks | 1 | Pcum. | 678 | ₹678 |
| 2 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | 1 | P.Kg | 144.5 | ₹144.5 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) | 1 | Pcum. | 6,340 | ₹6,340 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking. Earth upto 3Km | 1 | Pcum. | 209.5 | ₹209.5 |
| 5 | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. | 1 | Pcum | 384.5 | ₹384.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1020069.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .