Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-Finance | ₹8.6 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹9.1 L+₹53,835.80 (6.27%)Accepted-Finance | ₹9.1 L+₹53,835.80 (6.27%) | L2 | Accepted-Finance Admitted |
| 3 | L3₹9.4 L+₹85,971.50 (10.0%)Accepted-Finance R O DHOMKHAR | ₹9.4 L+₹85,971.50 (10.0%) | L3 | Accepted-Finance Admitted |
| 4 | L4₹9.7 L+₹1.1 L (13.4%)Accepted-Finance | ₹9.7 L+₹1.1 L (13.4%) | L4 | Accepted-Finance Admitted |
| 5 | L5₹11.3 L+₹2.7 L (31.4%)Accepted-Finance | ₹11.3 L+₹2.7 L (31.4%) | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S THINLESS ANGCHOK GOVT CONTRACTOR L4 | sonam tundup L1 | Aggxima Entrprise L3 | JAYSON ENTERPRISES L2 | M/S SD FABRICATION L5 | M/S JARA STEEL FABRICATION L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm 0n plan)including disposal of excavated earth, lead up to 50m and lift upto 1.5m
All kind of soil | 27.33 | cum | 350 ₹9,565.5 | 100 ₹2,733 Lowest | 250 ₹6,832.5 | 200 ₹5,466 | 200 ₹5,466 | 250 ₹6,832.5 |
| 1.02 | Providing and laying in cement concrete of specified grade include. Curing but excluding the cost of centering and shuttering. All work upto plinth level of 1:3:6 ( 1 cement, 3 coarse sand, stone aggregate of 20mm nominal size crushed stone aggregate) in blocks. | 27.33 | cum | 5,500 ₹1,50,315 | 5,500 ₹1,50,315 | 5,100 ₹1,39,383 Lowest | 5,500 ₹1,50,315 | 7,000 ₹1,91,310 | 6,800 ₹1,85,844 |
| 1.03 | Providing and fixing of Angle Iron Fence Post made of MS angles (50 x 50 x 6mm) in built up sections and framed works including. Cutting housing single section 2.14 Mtr long with 15cm foot/ toe at the bottom with whole drilled and top bends | 2,889 | kgs | 90 ₹2,60,010 | 80 ₹2,31,120 Lowest | 100 ₹2,88,900 | 99 ₹2,86,011 | 120 ₹3,46,680 | 130 ₹3,75,570 |
| 1.04 | Centering and shuttering including strutting, propping & removal of form for: Foundations, footings bases of columns etc for mass concrete. | 81 | sqm | 350 ₹28,350 | 200 ₹16,200 | 150 ₹12,150 | 95 ₹7,695 Lowest | 250 ₹20,250 | 120 ₹9,720 |
| 1.05 | Providing and fixing of G.I chain link fabric fencing cold
dip galvanized of required width in mesh sizes 7.62m×1.52
roll (4’’×4’’mesh size) including strengthening/binding
with nut bolt and washer as required complete as per the
direction of in charge. | 3,225 | kgs | 110 ₹3,54,750 | 100 ₹3,22,500 Lowest | 110 ₹3,54,750 | 100 ₹3,22,500 Lowest | 120 ₹3,87,000 | 130 ₹4,19,250 |
| 1.06 | Providing and fixing MS iron sheet 3mm of required pattern for sign board for main gate entrance with one cost of steel primer and two coats of paint including department logo and writing etc with cement concrete, sezing (6' X 4') with 7'00 legs (50 x 50 x 6mm) = 1 nos including all jobs as diredted by incharge. | 45 | kgs | 110 ₹4,950 | 90 ₹4,050 Lowest | 100 ₹4,500 | 99 ₹4,455 | 110 ₹4,950 | 130 ₹5,850 |
| 1.07 | Supply at site binding iron strip (patti) for binding chain
link to the angle iron post of required size with drilled holes
up to 10mm in dia for complete job.
Flat size: 40mm×6mm | 855 | kgs | 110 ₹94,050 | 80 ₹68,400 Lowest | 100 ₹85,500 | 95 ₹81,225 | 100 ₹85,500 | 130 ₹1,11,150 |
| 1.08 | Providing and installation of fabric iron Gates 6’ x 12’= 1 Nos with angle iron Framed including. Master pillars (6’’ x 6’’) with cutting hoisting welding and all fitted and fixture and all lead completely. | 160 | kgs | 110 ₹17,600 | 90 ₹14,400 Lowest | 100 ₹16,000 | 95 ₹15,200 | 110 ₹17,600 | 130 ₹20,800 |
| 1.09 | Providing and installation of febric iron Gates 4’ x 6’= 1 Nos with angle iron Framed including. Master pillars (6’’ x 6’’) with cutting hoisting welding and all fitted and fixture and all lead completely | 50 | kgs | 110 ₹5,500 | 120 ₹6,000 | 100 ₹5,000 | 95 ₹4,750 Lowest | 110 ₹5,500 | 130 ₹6,500 |
| 1.10 | Providing and laying and strengthening of barbed wire at top of the fence post including all jobs. | 150 | kgs | 110 ₹16,500 | 120 ₹18,000 | 100 ₹15,000 | 95 ₹14,250 Lowest | 120 ₹18,000 | 130 ₹19,500 |
Tender Value
₹13.1 L
EMD Value
₹26,240
Closing Date
1 Oct 2025, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Providing and fixing of chain link fencing at Takshang Nallah, Korzok for the year 2025-26 under the scheme CAMPA 52d
2025_FEE_17549_2
e-Tender No 18 of FDL 2025-26
Open Tender
Civil Works - Others
Item Rate
30 days
NYOMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Divisional Forest Officer
₹26,240
25 Oct 2025
18 Sept 2025
2 Oct 2025
18 Sept 2025
1 Oct 2025
18 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .