Maintenance Superintendent, KGS-1 and 2
NPCIL, Kaiga Site, Kaiga, Karwar, Uttara Kannada.
Crack filling and Injection Grouting by Ultra-Low Viscosity PU grout in stressing gallery of Reactor Building at KGS Unit-2, Kaiga.
2024_NPCIL_194920_2
CPPP/2024/027
Open Tender
Civil Works - Buildings
Item Rate
91 days
Kaiga Site
Experience in carrying out the jobs of epoxy / polyurethane grouting.
4 documents required · 4 mandatory
₹0
₹52,106
Office of Head CTC, Plant site
20 Dec 2024
8 Aug 2024
7 Sept 2024
8 Aug 2024
4 Sept 2024
21 Aug 2024
8 Aug 2024 - 16 Aug 2024
19 Aug 2024
Amount
Sealing of Cracks (V-groove): Make V-groove of size 15 mm wide and 10 mm deep approximately along the cracks manually using chisel and hammer or by using groove cutting machine, clean the V-groove using air jet and make them dirt & dust free. While fixing the nozzles along the V- grooves, simultaneously seal the V-groove using non-shrink two component epoxy putty to the concrete surface level.The rate shall include cost of all required material, machinery, tool,tackles , all consumables and labour wages etc ., Complete all as per specification and as directed by the Engineer-In-Charge at all heights / lifts and at all locations.
Fixing Nozzles for Injection Grouting: Drill holes of 12/14 mm dia along the cracks (V-groove) at an interval of 500 mm c/c for about 50 mm to 80mm deep, clean the holes using air jet and make them dirt & dust free. Fix the PVC nozzles/packers having non-returnable valves for pressure grouting using non-shrink two component epoxy putty . The rate shall include cost of all required material, machinery, tool,tackles , all consumables and labour wages etc ., Complete all as per specification and as directed by the Engineer-In-Charge at all heights / lifts and at all locations.
Injection Grouting of Ultra-Low Viscosity PU grout: Pressure grouting by two component Ultra-Low Viscosity PU grout having a viscosity less than 100 mPa.sec and hardens in both dry and wet conditions to form an elastic and flexible gel-like material, through pre-fixed nozzles/packers as per manufacturer's guidelines using a special two-comparment grouting pump, under pressure ( 2-3Kg/Sqcm) as per Technical specifications. Remove the nazzles/packers next day by cutting and seal it with non-shrink epoxy putty to the concrete surface level. The PU grout shall have the following Technical specification. Material- Two component PU grout of low viscosity Viscosity-<100 mPa.sec. Density-1.05 gm/cm3 Mixing ratio-1:1 parts by volume Application temperature->5oC Pot life-30 minutes. The rate shall include cost of all required material, machinery, tool,tackles , all consumables and labour wages etc ., Complete all as per specification and as directed by the Engineer-In-Charge at all heights / lifts and at all locations.
Sundaram Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .