Loading…
Loading…
Tender Value
₹90.1 L
EMD Value
₹2.1 L
Closing Date
1 Sept 2026, 5:00 pm
GM (JAL)
Water Work Compound Sector 5 Noida
Strengthening of Sewerage (Repairing and Finishing of Boundry Wall and Other Miscellaneous Civil work at SPS Sector-39), Noida.
2026_NOIDA_1178152_1
33/SM(Jal)-III/2026-27
Open Tender
Civil Works - Others
Fixed-rate
365 days
Noida
Please refer to tender documents
3 documents required · 3 mandatory
₹5,310
Noida
₹2.1 L
19 Aug 2026
19 Aug 2026
2 Sept 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster i/c disposal of rubbish to the dumping ground within 50 m lead. | 2,257 | Sqm | 20.47 | ₹46,200.79 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of E/I. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 167 | Cum | 923.42 | ₹1,54,211.14 |
| 3 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of E/I. In cement mortar. | 60 | Cum | 779.76 | ₹46,785.6 |
| 4 | Disposal of building rubbish/ malba/ similar unserviceable dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer -in- charge ,beyond 50 m initial lead, for all leads including all lifts involved. | 167 | Cum | 120.55 | ₹20,131.85 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) /anual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. The Contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | 46 | Cum | 144.93 | ₹6,666.78 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. | 46 | Cum | 93 | ₹4,278 |
| 7Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | |||||
| 7.01 | As in item 279 above but in proportions of 8:4:1 | 93 | Cum | 5,820 | ₹5,41,260 |
| 8 | M-150 Brick work in 1:4 one cement & 4 coarse sand of 2.20 F.M. motar in foundation and plint including supply of all materials. Labour and T&P etc. required for proper completion of the work | 18 | Cum | 4,950 | ₹89,100 |
| 9Centering and shuttering including strutting, propping etc. and removal of form for | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2213791.xls
BOQ • 0.34 MB
C33.xls
Additional Documents • 0.03 MB
TD33.pdf
Tender Documents • 1.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].