| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹17.3 Cr+₹1.1 Cr (7.06%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹17.5 Cr+₹1.3 Cr (7.80%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹18.0 Cr+₹1.8 Cr (11.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹20.4 Cr+₹4.2 Cr (25.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Shree Karni traders L5 | namdhari construction company L4 | M/S RAJENDRA PARSAD THEKEDAR BHIRANI L1 | dayanand contractor L3 | Zuberi Engineering Construction Private Limited L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance, thick including cutting bushes, shurbs and plants etc. for orginal earthwork.. | 2,18,520 | Per m² | 1 ₹2,18,520 | 2 ₹4,37,040 | 0.32 ₹69,926.4 Lowest | 2 ₹4,37,040 | 2 ₹4,37,040 |
| 2.00 | Earth work excavation in ordinary soil for distributies and minors having discharge less than 10 cumecs;
Earthwork undressed with combined lead upto 50m. | 5,04,642.78 | Sqm | 70 ₹3,53,24,994.6 | 185 ₹9,33,58,914.3 | 21.06 ₹1,06,27,776.95 Lowest | 35 ₹1,76,62,497.3 | 35 ₹1,76,62,497.3 |
| 3.00 | Excavation in ordinary soil for main canal and branches having discharge 10 cumecs and above earthwork undressed with combined lead upto 50 m | 3,79,395.59 | Per cum | 49 ₹1,85,90,383.91 | 55 ₹2,08,66,757.45 | 22 ₹83,46,702.98 Lowest | 35 ₹1,32,78,845.65 | 47 ₹1,78,31,592.73 |
| 4.00 | Earth work in excavation for foundation of structure complete with all lift, dewaterring, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 Depth Upto 3 metre | 3,982.73 | Cum | 172 ₹6,85,028.87 | 177 ₹7,04,942.5 | 17 ₹67,706.34 Lowest | 177 ₹7,04,942.5 | 130 ₹5,17,754.38 |
| 5.00 | Earth work in excavation including stacking/disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305).
Mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper | 4,836.36 | Cum | 34 ₹1,64,436.1 | 34 ₹1,64,436.1 | 3.4 ₹16,443.61 Lowest | 34 ₹1,64,436.1 | 50 ₹2,41,817.8 |
| 6.00 | Earth work in embankement construction, side slope etc, from already excavated earth in stockkpiles including breaking of clods and dressing with all lead and lift but excluding watering and rolling
By mechanical means using motor grader etc.
extra for watering the earth to bring the earth upto required O.M.C excluding rolling.
Extra for rolling to specification with the use of vibratory roller when earth is at suitable moisture content with desired density excluding watering.
Field density not less than 95% of maximum dry density ( Modified proctor test) | 4,836.36 | Cum | 40 ₹1,93,454.24 | 47 ₹2,27,308.73 | 4.7 ₹22,730.87 Lowest | 47 ₹2,27,308.73 | 47 ₹2,27,308.73 |
| 7.00 | Extra for slush or daldal that which will support man's weight | 19,208.59 | Cum | 7 ₹1,34,460.12 | 9 ₹1,72,877.3 | 1.5 ₹28,812.88 Lowest | 9 ₹1,72,877.3 | 15 ₹2,88,128.84 |
| 8.00 | Extra for slush or daldal that which will not support man's weight | 2,37,095.53 | Cum | 14 ₹33,19,337.38 | 15 ₹35,56,432.91 | 6 ₹14,22,573.16 Lowest | 15 ₹35,56,432.91 | 18 ₹42,67,719.49 |
| 9.00 | Extra for wet earthwork for depth above 0.3 meter of sub soil water | 36,012.62 | Per cum | 3 ₹1,08,037.86 | 4 ₹1,44,050.48 | 0.4 ₹14,405.05 Lowest | 4 ₹1,44,050.48 | 10 ₹3,60,126.19 |
| 10.00 | Carriage of Bats Ballast, Kankar, Sand, Bajri, Stone, Grit, Murram, Soling Stones For Road, Water, Good Earth.
1/2 m Lead | 3,79,395.59 | Per cum | 60 ₹2,27,63,735.4 | 1 ₹3,79,395.59 Lowest | 40 ₹1,51,75,823.6 | 30 ₹1,13,81,867.7 | 42 ₹1,59,34,614.78 |
Tender Value
₹19.4 Cr
EMD Value
₹38.8 L
Closing Date
16 Jul 2024, 6:00 pmClosed
Project Director PMU(RWSRPD) and Chief Engineer
Office of the Project Director PMU(RWSRPD) and Chief Engineer Water Resources(North) Hanumangarh
Construction of 5.4 KM long Open Main and lateral drains with CD works from RD 96.400 of IGMC to RD 149 of GDC with construction of drainage siphon to remove drainage congestion in Zone-II (P-353)
2024_WRDAS_395636_8
PMU_NIB_01_2024-25
Open Tender
Civil Works
Item Rate
365 days
Sriganganagar
As per bid documents
3 documents required · 3 mandatory
₹10,000
Executive Engineer WR Suratgarh Branch Division-I
₹38.8 L
Yes
Hanumangarh
27 Aug 2024
19 Jun 2024
18 Jul 2024
19 Jun 2024
16 Jul 2024
19 Jun 2024
19 Jun 2024 - 26 Jun 2024
26 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance, thick including cutting bushes, shurbs and plants etc. for orginal earthwork.. | 0.29 | Per m² | 2 | ₹0.58 |
| 2 | Earth work excavation in ordinary soil for distributies and minors having discharge less than 10 cumecs;
Earthwork undressed with combined lead upto 50m. | 0.58 | Sqm | 55 | ₹31.9 |
| 3 | Excavation in ordinary soil for main canal and branches having discharge 10 cumecs and above earthwork undressed with combined lead upto 50 m | 0.58 | Per cum | 55 | ₹31.9 |
| 4 | Earth work in excavation for foundation of structure complete with all lift, dewaterring, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 Depth Upto 3 metre | 0.4 | Cum | 177 | ₹70.8 |
| 5 | Earth work in excavation including stacking/disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305).
Mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper | 0.4 | Cum | - | - |
| 6 | Earth work in embankement construction, side slope etc, from already excavated earth in stockkpiles including breaking of clods and dressing with all lead and lift but excluding watering and rolling
By mechanical means using motor grader etc.
extra for watering the earth to bring the earth upto required O.M.C excluding rolling.
Extra for rolling to specification with the use of vibratory roller when earth is at suitable moisture content with desired density excluding watering.
Field density not less than 95% of maximum dry density ( Modified proctor test) | 0.4 | Cum | 47 | ₹18.75 |
| 7 | Extra for slush or daldal that which will support man's weight | 0.6 | Cum | - | - |
| 8 | Extra for slush or daldal that which will not support man's weight | 0.09 | Cum | 15 | ₹1.35 |
| 9 | Extra for wet earthwork for depth above 0.3 meter of sub soil water | 0.6 | Per cum | 4 | ₹2.4 |
| 10 | Carriage of Bats Ballast, Kankar, Sand, Bajri, Stone, Grit, Murram, Soling Stones For Road, Water, Good Earth.
1/2 m Lead | 0.58 | Per cum | 56.38 | ₹32.7 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Finalbid353.pdf
Tender Documents • 8.54 MB
BOQ_709816.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .