Repairing of boiler no WBL 11105 at Siduli Colliery under Kenda Area for timely certification
2023_ECL_294028_1
GM/KND/AE(ENM)/55(TN)/23-24/12
Open Tender
Miscellaneous Works
Item Rate
30 days
Siduli Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,300
10 May 2024
18 Nov 2023
4 Dec 2023
19 Nov 2023
2 Dec 2023
19 Nov 2023
19 Nov 2023 - 24 Nov 2023
Amount
Item Description/ Heading
Supply and fitting of new IBR quality fusible plugs(2 nos) in original manner with IBR test certificate and approval from Boiler Inspector
Cutting out of old adaptors 2 nos fabrication of two new adaptors from HT bar and then welding the same in the boiler
Staggered and isolated pitting was noticed on steam side surface of RHS flute at 4 o'clock to 8'o clock position at 1st strake. The position where the thickness gauging was carried are to be built up by electric arc welding with pre post heat treatment and dressed smooth to original shape and thickness
Staggered and isolated pitting was noticed on steam side surface of RHS flute at 4 o'clock to 8'o clock position at 2nd strake. The position where the thickness gauging was carried are to be built up by electric arc welding with pre post heat treatment and dressed smooth to original shape and thickness
All the Adamson ring joints of the boiler is to be caulked up to leak proof. Then the caulked area is to be dressed smooth
The main steam stop valve is to be dismantled thoroughly. The inner seat and the valves are to be GumMetal welded and machined to remove the leakage of the seat and valve. The spindle and the gland clearance are to be repaired by SS welding and machining the spindle upto leak proof. Then the valve ais to be refitted with necessary joing packing up to running order
The bottom manhole studs are to be replaced with newly fabriated studs as per IBR norms
Charges for replacement of 20 nos rivet of front end Adamson ring of both LHS and RHS flues
Fabrication of new blow down bend as per exisiting size and fitting the same in original manner
Repairing of Gauge Column Cocks by thorough dismantling of all parts and acid cleaning. The worn out SS spindles are to be replaced with new IBR quality sleeve bush, then they are to be re-fitted with necessary joint packings etc
The feed check valve is to be dismantled and cleaned thoroughly. The inner valve seat, valve NRV are to be repaired and valve spindles, gland is to be replaced with new one and refitted with necessary joint packings etc
Supply and fitting of 2" blow down valve(GM) with IBR TC after approval from Directorate of Boiler, Kolkata
Blanking of boiler using blank plates and necessary joints. Then filling the boiler with water
On completion of repairing job, the boiler is to be tested hydraulically with a pressure of 225lb/sq with satisfaction in presence of Dy. Director of Boilers, Durgapur
Total impact of GST for the purpose of CTC
C L Engineering Concern
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .