Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | -45.27% | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹35.8 L (15.5%)Admitted-Finance | -36.81% | ₹2.7 Cr+₹35.8 L (15.5%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹77.2 L (33.3%)Admitted-Finance | -27.03% | ₹3.1 Cr+₹77.2 L (33.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical has already got two number of works under SASCI |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
27 Jun 2026, 4:00 pmClosed
Executive Engineer, Flood Control Division, Akhnoo
Executive Engineer, Flood Control Division, Akhnoo
Construction of crate revetment/ earthen embankment for protection of army defence posts/ structure from manwar Tawi near manjeet post 2(Crate revetment with earthen bund on tipping section)
2026_IFC_312979_3
e-NIT 11 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Khour
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
Executive Engineer, Flood Control Division, Akhnoo
₹8.5 L
25 Aug 2026
19 Jun 2026
29 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tipping stone-filled wire crates in position; including equipment
charges. | 8,422.13 | cum | 312.2 | ₹26,29,388.99 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 14,618.13 | MT | 371.15 | ₹54,25,518.95 |
| 3 | Earth work in rough excavation, banking excavated earth in layers not exceeding
20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or
wooden or steel rammers, and rolling every 3rd and top-most layer with power roller
of minimum 8 tonnes and dressing up in embankments for roads, flood banks,
marginal banks and guide banks or filling up ground depressions, lead upto 50 m and
lift upto 1.5 m in all kinds of soil:. | 10,706.04 | cum | 741.05 | ₹79,33,710.94 |
| 4 | Supply of stones | 12,425.42 | CUM | 700 | ₹86,97,794 |
| 5 | Carriage of Stones for average 22 km by MT | 12,425.42 | cum | 508.27 | ₹63,15,468.22 |
| 6 | Earth/ RBM for avg. 1 Km by MT | - | MT | 160.93 | - |
| 7 | Carriage of material average 26 Km by MT | - | MT | 1,269.73 | - |
| 8 | Add cost of K. Crates | 459 | nos | 4,941 | ₹22,67,919 |
| 9 | Add cost of G. Boxes | 4,874 | nos | 1,350 | ₹65,79,900 |
| 10 | Add cost of B.A. Wire | 918 | kgs | 71 | ₹65,178 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1012983.xls
BOQ • 0.24 MB
dates.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .