Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹14.5 L+₹42,366.78 (3.00%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹15.1 L+₹96,210.60 (6.81%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹14.1 L
EMD Value
₹17,700
Closing Date
22 Jul 2024, 6:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1 no 1200 mm width x 85 mtr length belt conveyor at 16WL From incline to 4WD of Shyamsundarpur colliery under Bankola Area.
2024_ECL_312462_1
ECL/GM/BA/E TENDER/24-25/EnM/99 Dt 11.07.2024
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹17,700
4 Jul 2025
12 Jul 2024
23 Jul 2024
12 Jul 2024
22 Jul 2024
12 Jul 2024
12 Jul 2024 - 16 Jul 2024
Amount
Item Description/ Heading
Transportation and installation of complete 1200 mm drive with gear motor& base frame 14MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 85 mtr 80kg/mtr =6.8MT + starter 1.5 MT, total weight =31.65MT
Fiting of tail end and discharge skapper
Belt laying including transportation of belt jointing tenssioning trail run etc
Providing bolts and nut for fitting of above structure 85mtr 1.5Kg/mtr 127kg load table discharge and bend pulley loop take up 25 kg =152 kg
Foundation bolting' for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36, total =98 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles
Cleaning coal and unused materials and laveling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive and tail end etc
Drive base frame, discharge base and loop take up cement concrete
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .