Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -62.00% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | -58.33% | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.2 LAdmitted-Finance | -56.44% | ₹5.2 L | L3 | Admitted-Finance |
| 4 | L4₹5.2 LAdmitted-Finance | -56.35% | ₹5.2 L | L4 | Admitted-Finance |
| 5 | L5₹5.2 LAdmitted-Finance | -56.34% | ₹5.2 L | L5 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
6 Apr 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_306843_1
e-NIT No.205 of 2025-26 Dated 27-03-2026
Open Tender
Civil Works
30 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹24,000
25 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : 60% Ordinary Rock 40% | 4,117.6 | Cum | - | - |
| 2 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe | 15 | Rmt | - | - |
| 3 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe | 7.5 | Rmt | 2,415.8 | ₹18,118.5 |
| 4Carriage of materials by mechanical transport including loading / unloading and stacking complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe by a aerage distance of 90 kms by M.T. | |||||
| 5Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe by a aerage distance of 90 kms by M.T. | |||||
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_996013.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid