Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹44,040.90 (9.66%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.2 L+₹66,721.36 (14.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.2 L+₹67,801.39 (14.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹5.2 L+₹67,921.39 (14.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
6 Apr 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_306843_1
e-NIT No.205 of 2025-26 Dated 27-03-2026
Open Tender
Civil Works
Percentage
30 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹24,000
25 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : 60% Ordinary Rock 40% | 4,117.6 | Cum | - | - |
| 2 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe | 15 | Rmt | - | - |
| 3 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe | 7.5 | Rmt | 2,415.8 | ₹18,118.5 |
| 4Carriage of materials by mechanical transport including loading / unloading and stacking complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe by a aerage distance of 90 kms by M.T. | |||||
| 5Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe by a aerage distance of 90 kms by M.T. | |||||
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_996013.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .