Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹80,200Qualified Make: SHAKTI
Model: SZRSRMX036-IC 212 B BOMBAY TALKIES COMPOUND HIMANSHU RAI ROAD MALAD WEST MUMBAI MAHARASHTRA 400064 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | Make: SHAKTI
Model: SZRSRMX036-IC | L1 | Qualified MSE, Category: General | |
| 2 | L2₹82,400+₹2,200 (2.74%)Qualified Make: GLYNC
Model: CAL036 B 1 A 26 MOHAN CO OPERATIVE INDS ESTATE MATHURA ROAD BADARPUR NEW DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | Make: GLYNC
Model: CAL036 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹88,500+₹8,300 (10.3%)Qualified Make: JILCO
Model: 36W LED PANEL, JLED-SBP-36 B 70 21 22 23 DSIDC IND COMPLEX LAWRENCE ROAD DELHI DELHI 110035 | NORTH WEST DELHI | DELHI | 110035 | Make: JILCO
Model: 36W LED PANEL, JLED-SBP-36 | L3 | Qualified MSE, Category: General | |
| 4 | L4₹95,000+₹14,800 (18.5%)Qualified Make: GEARUP
Model: GEARUP LED RECESSED 36W 3A 155 D N I T FARIDABAD FARIDABAD HARYANA 121001 | FARIDABAD | HARYANA | 121001 | Make: GEARUP
Model: GEARUP LED RECESSED 36W | L4 | Qualified MSE, Category: General | |
| 5 | L5₹1.0 L+₹20,100 (25.1%)Qualified Make: KI Kalingia
Model: KIPL 36W A 2 DSIIDC COMPLEX JHILMIL INDUSTRIAL AREA DELHI DELHI 110095 | SHAHDARA | DELHI | 110095 | Make: KI Kalingia
Model: KIPL 36W | L5 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
10 Sept 2025, 11:00 amClosed
LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6557934 Dated : 30-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8208188
GEM/2025/B/6557934
Two Packet Bid
LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
60 days
Kumar603102MADRAS ATOMIC POWER STATION, KALPAKKAM, CHENGALPATTU DISTRICT
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
30 Aug 2025
30 Aug 2025
10 Sept 2025
LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6557934 Dated : 30-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8208188.pdf
GEM_BID
atcbdr1_dbcf01a7-a772-4c02-a9821755324854516_maps_buyer4.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .