Tender ID
Tender Value
₹14.4 Cr
EMD Value
₹36.1 L
Closing Date
18 Apr 2026, 3:00 pmClosed
Superintending Archaeologist
O/o The SA, ASI Kendriya sadan II nd block, IIIrd floor Koti, Hyderabad
provision for carving three line dressing and hiring of static crane provision made filling the joints between roof slabs
2026_ASI_904473_1
Sout/Hyde/WARA/THOU/23786262
Open Tender
Civil Works
Works
Thousand Pillar Temple
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36.1 L
Yes
O/o The SA, ASI Kendriya sadan Hyderabad
8 Jun 2026
3 Apr 2026
20 Apr 2026
3 Apr 2026
18 Apr 2026
3 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of the Monument / Site: Thousand Pillar Temple, Hanamkonda | |||||
| 1.01 | Provision for carving, three line dressing into required ornamental sizes and shapes including procurement of new huge granite stone blocks of required sizes and shapes including 25% wastage of stones matching with monument in nature, texture and colour to be fixed in place of missing ornamental stone members of adhistana, kakshasana, pillars of kakshasana with bases, capitals, roof beams , floor and roof slabs of Kalyanamandapa and matching with original existing pattern by skilled artisans etc. all complete including charges for accommodations etc. all complete item of work as directed by departmental officials for 1.00 cubic meter: Quantity will increase or decrees as per site condition. | 155.19 | Cum | - | - |
| 1.02 | Provision for resetting of available and new ornamental stone members of adhistana, kakshasana, pillars of kakshasana with bases, capitals, roof beams, floor and roof slabs of Kalyanamandapa as per the pre documentation and drawings before removal as per traditional methods adopted similar kind of restoration adapted during previous restoration as per original existing pattern by skilled artisans etc. all complete including charges for accommodations etc. all complete item of work as directed by departmental officials for 1.00 cubic meter: Quantity will increase or decrees as per site condition. | 40.1 | Cum | - | - |
| 1.03 | Provision for Hiring of 16T capacity Hydraulic Crane at Site and stock yard for loading and unloading, lifting for positioning, transport to site of work and setting in required orientation of the ornamental members etc., inclusive of Hire charges, crew charges and fuel charges etc., complete as directed on monthly basis/weekly basis/daily basis as per the site requirement in Hours:
Quantity will increase or decrees as per site condition. | 640 | Hours | - | - |
| 1.04 | Provision for Hiring of STATIC Crane (30T - 50T) with High boom to work at site of Kalyanamandapa for lifting for positioning, transport to site of work and setting in required orientation of the ornamental members etc., inclusive of Hire charges, crew charges and fuel charges etc., complete as directed on monthly basis/weekly basis/daily basis as per the site requirement in hours:
Quantity will increase or decrees as per site condition. | 640 | Hours | - | - |
| 1.05 | Provision made filling the joints between roof slabs having minor width to full depth of joint (Approximate depth 0.30m) with Lime Mortar 1:1:1 (1 Lime: 1 Sand: 1 Surkhi) after properly secured the joint bottom with necessary support like wooden or iron shuttering temporarily till filling the joint and mortar become enough hard and including removing the shuttering after setting completes including cost of materials, labour charges, loading, unloading, conveyance, taxes etc. all complete as per the directions of department officials. 10% area considered for estimation purpose for 1.00 cubic meter:
Quantity will increase or decrees as per site condition. | 23.49 | Cum | - | - |
| 1.06 | Provision made for providing lime concrete with Lime Concrete 1:1:1:4 (1 Lime: 1 Sand: 1 Surkhi: 4 parts 63mm/50mm/40mm brick aggregate) with 63mm/50mm/40mm brick aggregate on the roof required gradient to dispose rain water immediately including cost of materials, labour charges, loading, unloading, conveyance, taxes etc. all complete as per the directions of department officials (average thick ness is considered for estimate purpose) for 1.00 cubic meter: Quantity will increase or decrees as per site condition. | 117.5 | Cum | - | - |
| 1.07 | Provision made for providing lime concrete with Lime Concrete 1:1:1: 3 (1 part Lime: 1 part Sand: 1 part Surkhi: 3 parts 20mm brick aggregate) with 20mm brick aggregate on the roof required gradient to dispose rain water immediately including cost of materials, labour charges, loading, unloading, conveyance, taxes etc. all complete as per the directions of department officials (average thick ness is considered for estimate purpose) for 1.00 cubic meter: Quantity will increase or decrees as per site condition. | 76.61 | Cum | - | - |
| 1.08 | Provision made for providing finishing coat with Lime Mortar 1:1:1 (1 part Lime: 1 part Sand: 1 part Surkhi) in 20mm thick plastering including cost of materials, labour charges, loading, unloading, conveyance, taxes etc. all complete as per the directions of department officials for
1.00 square meter: Quantity will increase or decrees as per site condition. | 510.77 | Sqm | - | - |
| 1.09 | Provision for documentation including digital drawings, surveys, drone and video photography etc.: Quantity will increase or decrees as per site condition. | 1 | unit | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 36.58 MB
RFPMCEWRestorationofKalyanMandapa.pdf
Tender Documents • 36.56 MB
BOQ_950685.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .