| 1 | L-1₹88.0 LAccepted-AOC | L-1 | Accepted-AOC responsive | |
| 2 | L-2₹95.1 L+₹7.1 L (8.01%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | L-2 | Rejected-Finance NON RESPONSIVE | |
| 3 | L-3₹99.3 L+₹11.2 L (12.8%)Rejected-Finance | L-3 | Rejected-Finance NON RESPONSIVE |
Tender Value
₹1.6 Cr
EMD Value
₹9.9 L
Closing Date
8 Aug 2025, 12:00 pmClosed
SE MBD CIRCLE PWD MORADBAD
SE MBD CIRCLE PWD MORADBAD
Year 2025-26 Yojna to connect tehsil block headquarters with 2 lanes Widening and strengthening work of Meerut Badaun Road (SH-18) to Gunnaur Abdul Hai Road
2025_CEMBD_1060521_2
4726/E-Nivida-MBD Circle/24-25 DT 08-07-2025
Open Tender
Civil Works - Roads
Percentage
360 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.9 L
Yes
SE MBD CIRCLE PWD MORADBAD
27 Sept 2026
26 Jul 2025
8 Aug 2025
26 Jul 2025
8 Aug 2025
26 Jul 2025
28 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Dismantling of existing structures Prestressed / reinforced cement concrete grade M-20 & above, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Close No 202 II B By Mechanical Means and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 24 | cum | 3,000 | ₹72,000 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 900 | cum | 55 | ₹49,500 |
| 4 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge with in a distance of 60 meter (200 feet). SI No 697 and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 1,000 | Sqm | 45 | ₹45,000 |
| 5 | Construction of embankment with approved material obtained from borow pits with all lifts and leads trancporting to sites, spreading, grading to required slope and compected to meet requirement of table 300.2 and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 200 | cum | 185 | ₹37,000 |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 359 | cum | 4,600 | ₹16,51,400 |
| 7 | Providing laying spereading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in uniform layers with paver in subbase /base course on well prepared surface and compacting with vibratory roller to achieve the desired density and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 159 | cum | 5,100 | ₹8,10,900 |
| 8 | Providing and applying primer coat with SS -2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 765 | Sqm | 35 | ₹26,775 |
| 9 | Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 3,599.4 | Sqm | 11 | ₹39,593.4 |
| 10 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 179 | cum | 11,500 | ₹20,58,500 |
| 11 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST | 107 | cum | 13,200 | ₹14,12,400 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 5.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .